SSERC · Sikkim State Electricity Regulatory Commission
Sikkim Intra-State Open Access Regulations, 2012
Sikkim State Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2012
RegulationDated 20 Jun 2012Published in the Gazette 30 Jun 2012No. 06/SSERC/ISOA/2012 dated 20th June, 2012
Summary
Summary written by software, from pages 1 to 40 of 53. Check the regulator's original before you rely on it.
This is the principal instrument by which the Sikkim State Electricity Regulatory Commission opened the State's intra-State transmission and distribution wires to third-party use — Notification No. 06/SSERC/ISOA/2012 dated 20 June 2012, published in the Sikkim Government Gazette (Extraordinary, No. 309) on 30 June 2012, from which date it comes into force (p1). It covers open access on intra-State transmission and/or distribution systems, including where those systems are used in conjunction with the inter-State transmission system (p1).
Chapter 1 (pp1–3) sets the title, commencement and extent, and supplies the definitions that carry through the whole regulation — allotted and reserved capacity, the three open-access durations, imbalance, wheeling, the STU, SLDC and the nodal agency (pp2–3).
Chapter 2 (pp4–7) deals with connectivity, which it treats as a prerequisite distinct from open access. It fixes who connects where (consumers and generating stations at 1 MW and above to the transmission system, generating stations below 1 MW to the distribution system), the application route and fee to the STU or distribution licensee, interconnection studies under the CEA Technical Standards for Connectivity to the Grid Regulations, 2007 and the State Grid Code, connection and tripartite agreements, dedicated lines, a 60-day decision clock, and the rule that connectivity alone does not permit interchange of power. It also allows testing and infirm-power injection before commercial operation.
Chapter 3 (pp8–10) sets general conditions: eligibility of licensees, generating companies, captive plants and consumers; the capacity threshold for open access and the captive exemption; disqualification of insolvents and defaulters; mandatory ABT meters and RTUs; transitional arrangements letting existing distribution licensees and existing open-access users continue on their current terms; and the test for granting long-, medium- and short-term access, including when augmentation of the network may be required.
Chapter 4 (pp11–34) is the operational core. It classifies applicants by system, location of drawal and injection points, and duration; prescribes the application in triplicate with an undertaking against multiple PPAs; and puts the nodal agency, application fee, documents and disposal timelines into two tables (pp12–22). It then lays out the procedure for long-term access (with a bank guarantee per MW and a construction-phase regime), medium-term access, and short-term access in advance, day-ahead and in contingency — including an electronic bidding mechanism, with allocation rules, when demand exceeds available capacity. It also covers consent (and deemed consent) from the STU, SLDC and distribution licensee, summary rejection of defaulters, and a hierarchy of allotment priority.
Chapter 5 (p35) requires the STU to file a detailed procedure with the Commission within 60 days, after public consultation, covering application forms, agreements and bank guarantees.
Chapter 6 (pp36–40) sets out charges: a shared transmission charge for long- and medium-term users based on total transmission cost and allotted capacity, a fractional rate with part-day slabs for short-term users, scheduling and system operation charges, wheeling charges determined in the tariff order, cross-subsidy surcharge on the Tariff Policy formula, additional surcharge tied to stranded fixed costs, and residual regulatory and congestion charges.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.