Skip to content

India's electricity regulations in one place.

Search the regulations of CERC and 26 state commissions as clean text. Each one is shown with the amendments Voltaic holds, the documents to read with it and a link to the regulator's original. Voltaic is built for decisions that have to be defended.

Use in Claude or ChatGPT

From the library
CERC · Regulation · 7 Aug 2009

L-1/(3)/2009-CERC

Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

Its history

Made in 2009; amended in 2010, 2012, 2013, 2014, 2015, 2017 and 2019; replaced by the 2022 regulations.

51 documents to read with itOpen the regulation →
Documents
4,667
Regulators
27CERC and 26 state commissions
Newest document in the library
24 Nov 2026

Inside the AI you already use

Ask Claude or ChatGPT, and check every answer against the passage it cites.

With Voltaic connected, your AI searches the library and cites the passages it relies on. Each citation opens that passage on Voltaic. Connecting needs a Voltaic key. We issue keys by email and reply within one working day.

Use in Claude or ChatGPT

A practitioner asks

Which state commissions have set an energy storage obligation for their distribution licensees, and how do their trajectories compare?

The AI answers, citing Voltaic

Three examples from the library show how state commissions set storage obligations.

Storage obligation, % of energy, by financial year

Energy storage obligation by state and financial year, per cent, energy basis
StateFY25FY26FY27FY28FY29FY30
Gujarat1.0% FY25 → 3.5% FY301.0%1.5%2.0%2.5%3.0%3.5%
Share of total consumption.
Delhi2.5% FY27 → 4.0% FY30··2.5%3.0%3.5%4.0%
Share of total consumption. Applies from 2026-27; to be reviewed periodically.
Madhya Pradesh2.5% FY27 → 4.0% FY30··2.5%3.0%3.5%4.0%
Share of total energy procured, not consumed. Set by an amendment of 2026; to be reviewed periodically.

In all three, the obligation is met only if at least 85% of the energy stored in a year comes from renewable sources.

The full written answer and its sources

Gujarat's Procurement of Energy from Renewable Sources Regulations, 2025 set storage at 1.0% of total consumption in 2024-25, rising by half a percentage point a year to 3.5% in 2029-30. [1]

Delhi's RPO and REC Framework Implementation Regulations, 2025 apply the obligation from 2026-27, starting at 2.5% and reaching 4.0% in 2029-30. [2] Madhya Pradesh's Sixth Amendment of 2026 sets the same path, measured as a share of total energy procured rather than consumed. [3]

In all three, the obligation counts as met only when at least 85% of the energy stored in a year comes from renewable sources. Other commissions hold storage provisions too; check each document, and the documents to read with it, before relying on it.

  1. [1]Procurement of Energy from Renewable Sources Regulations, 2025, Table-2 (GERC, 8 Aug 2025)
  2. [2]RPO and REC Framework Implementation Regulations, 2025, Table 4 (DERC, 10 Oct 2025)
  3. [3]Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021 — Sixth Amendment, 2026, Regulations 3.1.9 and 3.1.10 (MPERC, 4 Aug 2026)

This is an example. Claude wrote the answer from Voltaic search results on 15 November 2026; the quotations are taken from the documents, and each citation opens the passage it relies on. It is not legal advice, so read the passages before you rely on them.

GERC · Regulation · 8 Aug 2025[1] Table-2, notes (ii) and (iii)

Procurement of Energy from Renewable Sources Regulations, 2025

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one. Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

(ii) The Energy Storage Obligation in Table-2 above shall be calculated in energy terms as a percentage of total consumption of electricity and shall be treated as fulfilled only when at least 85% of the total energy stored in the Energy Storage System (ESS), on an annual basis, is procured from renewable energy sources.

(iii) The Energy Storage Obligation to the extent of energy stored from RE sources shall be considered as a part of fulfilment of the total RPPO as mentioned in Table-1 above.

Open this passage on Voltaic →

Every regulation, with the documents to read with it.

Shown here on one real regulation, as its page on Voltaic shows it.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one. Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

The text, with the regulator's link

Every document is held as clean text, with its reference and a link to the original on the regulator's website.

Warnings that rest on evidence

A draft is marked as a draft. A regulation is marked as replaced only when the later regulation says so or when we have checked it ourselves. A document with no mark is not confirmed to be in force; it means only that Voltaic holds no proof of a warning.

The documents to read with it

Amendments, the commission's reasons, and the procedures and orders made under it, in one reading list.

How to read a Voltaic page →

What the library holds

4,667 documents from CERC and 26 state commissions. The newest is dated 24 Nov 2026.

Documents in the library200 or more100 to 19950 to 991 to 49None yet

Most documents in the library

  1. Central Electricity Regulatory Commission1,111newest document 16 Nov 2026
  2. Himachal Pradesh Electricity Regulatory Commission412newest document 13 Oct 2026
  3. Tamil Nadu Electricity Regulatory Commission323newest document 1 Jun 2026
  4. Maharashtra Electricity Regulatory Commission295newest document 9 Oct 2026
  5. Delhi Electricity Regulatory Commission228newest document 10 Nov 2026

Not in the library yet: tariff orders and tariff filings, case orders, government policies, and instruments of the Ministry of Power, CEA and MNRE.

Voltaic does not yet read every regulator's website each day. The coverage page shows when each was last read; a document issued after that date may not be here yet. Coverage →

Who uses it, and for what

  • Regulatory and commercial teams at developers and utilities

    Check the connectivity, access, charges and storage rules that affect a bid, an application or a contract.

    Searchstorage drawal T-GNA
  • Consultants and advisers

    Find the clause and its amendments across commissions, and send the client a link to the passage itself.

    SearchT-GNA corridor allocation
  • Lawyers and regulatory specialists

    Reconstruct an instrument with its amendments, statements of reasons and the orders made under it, and cite the passage you rely on.

    Searchenergy storage obligation

Where Voltaic is going

We are building the intelligence layer for India's power sector, starting with its regulations.

Each layer depends on the one below it. A landed-cost figure can be defended only if every charge in it links to the clause that sets it, in a regulation whose status is known. That is why the rules come first.

  1. LaterThe decisionsGiven my situation, what should I do?
  2. LaterThe marketsWhat actually happened in the market and on the grid?
  3. LaterThe figuresWhat do the rules charge, oblige or allow?
  4. NextComparisons and monitoringHow do the commissions differ, and what has changed?
  5. Live todayThe rulesWhat do the rules say, and since when?

Search the library now, or ask your first question from inside Claude or ChatGPT.