Search the regulations of CERC and 26 state commissions as clean text. Each one is shown with the amendments Voltaic holds, the documents to read with it and a link to the regulator's original. Voltaic is built for decisions that have to be defended.
Search, summaries and the regulator's originals are open to everyone. Full text on Voltaic needs a key, which we issue by email.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Its history
20092022
Made in 2009; amended in 2010, 2012, 2013, 2014, 2015, 2017 and 2019; replaced by the 2022 regulations.
Ask Claude or ChatGPT, and check every answer against the passage it cites.
With Voltaic connected, your AI searches the library and cites the passages it relies on. Each citation opens that passage on Voltaic. Connecting needs a Voltaic key. We issue keys by email and reply within one working day.
Which state commissions have set an energy storage obligation for their distribution licensees, and how do their trajectories compare?
The AI answers, citing Voltaic
Three examples from the library show how state commissions set storage obligations.
Storage obligation, % of energy, by financial year
Energy storage obligation by state and financial year, per cent, energy basis
State
FY25
FY26
FY27
FY28
FY29
FY30
Gujarat1.0% FY25 → 3.5% FY30
1.0%
1.5%
2.0%
2.5%
3.0%
3.5%
Share of total consumption.
Delhi2.5% FY27 → 4.0% FY30
·
·
2.5%
3.0%
3.5%
4.0%
Share of total consumption. Applies from 2026-27; to be reviewed periodically.
Madhya Pradesh2.5% FY27 → 4.0% FY30
·
·
2.5%
3.0%
3.5%
4.0%
Share of total energy procured, not consumed. Set by an amendment of 2026; to be reviewed periodically.
In all three, the obligation is met only if at least 85% of the energy stored in a year comes from renewable sources.
The full written answer and its sources
Gujarat's Procurement of Energy from Renewable Sources Regulations, 2025 set storage at 1.0% of total consumption in 2024-25, rising by half a percentage point a year to 3.5% in 2029-30. [1]
Delhi's RPO and REC Framework Implementation Regulations, 2025 apply the obligation from 2026-27, starting at 2.5% and reaching 4.0% in 2029-30. [2] Madhya Pradesh's Sixth Amendment of 2026 sets the same path, measured as a share of total energy procured rather than consumed. [3]
In all three, the obligation counts as met only when at least 85% of the energy stored in a year comes from renewable sources. Other commissions hold storage provisions too; check each document, and the documents to read with it, before relying on it.
This is an example. Claude wrote the answer from Voltaic search results on 15 November 2026; the quotations are taken from the documents, and each citation opens the passage it relies on. It is not legal advice, so read the passages before you rely on them.
GERC · Regulation · 8 Aug 2025[1] Table-2, notes (ii) and (iii)
Procurement of Energy from Renewable Sources Regulations, 2025
As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one. Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
(ii) The Energy Storage Obligation in Table-2 above shall be calculated in energy terms as a percentage of total consumption of electricity and shall be treated as fulfilled only when at least 85% of the total energy stored in the Energy Storage System (ESS), on an annual basis, is procured from renewable energy sources.
(iii) The Energy Storage Obligation to the extent of energy stored from RE sources shall be considered as a part of fulfilment of the total RPPO as mentioned in Table-1 above.
A battery storage project has its connectivity to the inter-State network, but CTU's final grant shows its drawal as 'NIL' until a drawal study is done. Can it charge from the grid in the meantime?
The AI answers, citing Voltaic
Yes. CERC's order of 8 December 2025 lets such storage draw charging power from the grid under T-GNA, within its connectivity and the available margins, until CTU completes the drawal study. [1]
The full answer and its sources
In its December 2025 order removing difficulties under the GNA Regulations, CERC held that storage issued Connectivity with drawal shown as 'NIL' because CTU's studies are pending "shall be allowed to draw charging power from the Grid under T-GNA, limited to Connectivity quantum granted, based on the margins" until the drawal study is complete and any augmentation is in place. After that, drawal is under GNA, for the quantum the Nodal Agency allows. CTU was directed to finish the studies within four months of the order. [1]
For new applications, Regulation 5.2A, added by the Third Amendment in 2025, requires a renewable generating station with storage to state its maximum injection and its maximum drawal for charging, within its Connectivity quantum. [2]
The order was made on a request from NSEFI. Check the passages, and whether anything issued after them changes the position.
This is an example. Claude wrote the answer from Voltaic search results on 15 November 2026; the quotations are taken from the documents, and each citation opens the passage it relies on. It is not legal advice, so read the passages before you rely on them.
CERC · Order · 8 Dec 2025[1] para 30
Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties Order, 2025
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
30. … such ESS, who have been issued Connectivity with drawal quantum as 'NIL' due to pending studies by CTUIL … shall be allowed to draw charging power from the Grid under T-GNA, limited to Connectivity quantum granted, based on the margins till the Nodal Agency completes the drawal study and implements the augmentation (if required). … CTU is directed to complete the drawal studies expeditiously within four months from the issuance of this order.
Have CERC's Open Access in inter-State Transmission Regulations, 2008 been repealed?
The AI answers, citing Voltaic
Yes, with exceptions. Regulation 43.2 of the Connectivity and GNA Regulations, 2022 repealed them, but Regulation 43.3 keeps the real-time market provisions in force until the Grid Code covers them. [1]
The full answer and its sources
Voltaic shows the 2008 Open Access Regulations as replaced by the Connectivity and General Network Access Regulations, 2022. [2]
The basis is Regulation 43.2 of the 2022 Regulations, which repeals "the Open Access Regulations and the following Procedures issued thereunder", including the scheduling procedures of 2011 and the NOAR procedure of 2022. [1]
Regulation 43.3 keeps some provisions alive: the definitions and clauses on the real-time market "shall continue to be in force till corresponding provisions are included in the Grid Code and become effective". Check whether the Grid Code now covers them before relying on either text. [1]
This is an example. Claude wrote the answer from Voltaic search results on 15 November 2026; the quotations are taken from the documents, and each citation opens the passage it relies on. It is not legal advice, so read the passages before you rely on them.
CERC · Notification · 7 Jun 2022[1] Regulations 43.2 and 43.3
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one. Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
43.2. Save as otherwise provided in these regulations, the Open Access Regulations and the following Procedures issued thereunder, are hereby repealed: …
43.3. Notwithstanding such repeal: … (b) Sub-clause (g-a) of Clause (1) of Regulation 2, sub-clause (ma) of clause (1) of Regulation 2, clause 13(A) of Regulation 13 and clause (1) of Regulation 20 of Open Access Regulations, related to Real time market and Procedure for Scheduling of Collective Transactions through Real Time Market shall continue to be in force till corresponding provisions are included in the Grid Code and become effective.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one. Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Every document is held as clean text, with its reference and a link to the original on the regulator's website.
2Warnings that rest on evidence
A draft is marked as a draft. A regulation is marked as replaced only when the later regulation says so or when we have checked it ourselves. A document with no mark is not confirmed to be in force; it means only that Voltaic holds no proof of a warning.
3The documents to read with it
Amendments, the commission's reasons, and the procedures and orders made under it, in one reading list.
Not in the library yet: tariff orders and tariff filings, case orders, government policies, and instruments of the Ministry of Power, CEA and MNRE.
Voltaic does not yet read every regulator's website each day. The coverage page shows when each was last read; a document issued after that date may not be here yet. Coverage →
Who uses it, and for what
Regulatory and commercial teams at developers and utilities
Check the connectivity, access, charges and storage rules that affect a bid, an application or a contract.
We are building the intelligence layer for India's power sector, starting with its regulations.
Each layer depends on the one below it. A landed-cost figure can be defended only if every charge in it links to the clause that sets it, in a regulation whose status is known. That is why the rules come first.
LaterThe decisionsGiven my situation, what should I do?
LaterThe marketsWhat actually happened in the market and on the grid?
LaterThe figuresWhat do the rules charge, oblige or allow?
NextComparisons and monitoringHow do the commissions differ, and what has changed?
Live todayThe rulesWhat do the rules say, and since when?
Search the library now, or ask your first question from inside Claude or ChatGPT.