MERC · Maharashtra Electricity Regulatory Commission
EON SEZ Phase II Specific Conditions of Distribution Licence Regulations, 2021
Maharashtra Electricity Regulatory Commission [Specific Conditions of Distribution Licence applicable to M/s EON Kharadi Infrastructure Pvt. Ltd. for the IT and ITES SEZ at Survey No.72, Kharadi, Pune (EON SEZ Phase II)] Regulations, 2021
RegulationDated 9 Jun 2021Published in the Gazette 9 Jun 2021MERC/TEC/ Licence Conditions/ EON Phase II/2021/ 0264 dated 9th June 2021
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a MERC principal regulation that writes the licence conditions for a single deemed distribution licensee — M/s EON Kharadi Infrastructure Pvt. Ltd. — for the IT and ITES SEZ at Survey No.72, Kharadi, Pune (EON SEZ Phase II). It is made under s.181(2)(d) read with s.16 and s.14(b) of the Electricity Act, 2003 and carries number MERC/TEC/Licence Conditions/EON Phase II/2021/0264 (p6).
The operative text is short. Sections 1–2 give the title, extent and commencement, and define the Act, the SEZ Act and SEZ Rules, the Developer, the General Conditions of Distribution Licence Regulations 2006, EON itself and the "Deemed Distribution Licensee" status (p6–7). Section 3 makes these specific conditions, read with the MERC General Conditions, the conditions of EON's licence for distribution and retail supply (p7). Section 4 fixes the area of supply by reference to the Government of India SEZ notification and a map deposited with the Commission, and requires the licensee to come back to the Commission within 15 days of any future SEZ notification or de-notification (p7); supply must continue in a de-notified area until alternative supply is arranged (p8). Section 5 sets the licence term of 25 years running from 31 March 2017, the SEZ notification date, to 30 March 2042 or earlier revocation (p8). Sections 6–9 cover public inspection of the licence and approvals, a 24-hour uninterrupted supply obligation, the Commission's power to amend, and a power to remove difficulties by order (p8). Schedule I, the area-of-supply map, is on the final page (p9).
Read with this
Commencement notices and reasons
4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.