Skip to content

AERC · Assam Electricity Regulatory Commission

Demand Response Regulations, 2024

AERC (DEMAND RESPONSE), REGULATIONS 2024

RegulationDated 19 Dec 2024Published in the Gazette 21 Jan 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Assam Electricity Regulatory Commission (Demand Response) Regulations, 2024 (AERC No.929/2024/17) create a framework for demand response (DR) in Assam. Made under s.181(2)(zp) of the Electricity Act, 2003, they apply to all distribution licensees, aggregators and all categories of consumers connected to the state grid, and extend to the whole of Assam (p4). They commence on publication in the Official Gazette (p1).

Chapter I defines key terms such as aggregator, demand response, distributed generation, prosumer, control period, ancillary services and evaluation, measurement and verification, and sets applicability (p1–4). Chapter II states objectives — integrating DR into daily DISCOM operations, load shifting, peak reduction, cost optimisation, Time-of-Use pricing, network security, ancillary services and renewable/distributed generation integration — and requires DISCOMs to assess DR potential and the Commission to set targets; it also allows the Commission to issue DR guidelines (p5–7). Chapter III requires a Demand Response Cell, ordinarily the existing DSM Cell, headed by a Chief General Manager, with defined functions from potential assessment to reporting and data protection (p8–9).

Chapter IV sets the DR process: baseline study and potential estimation, development of a program document with specified contents, review and approval alongside MYT/APR processes, execution, and cost-recovery mechanisms (p10–13). Chapter V covers monitoring, completion reports and evaluation, measurement and verification, including possible third-party verification (p14–15). Chapter VI adopts CEA/BIS and, where absent, IEC/IEEE/ANSI standards for systems, networks, communications and products, and sets customer data protection standards distinguishing PII and CEUD, with testing and certification requirements (p15–17). Chapter VII deals with customer participation and incentives, including opt-in/opt-out, ToU/RTP/CPP tariffs, and awareness and capacity building (p17–18). Chapter VIII contains miscellaneous powers — orders and practice directions, removal of difficulties, relaxation, interpretation, amendment and inherent powers (p19–20). Annexure A lists indicative CEA regulations, guidelines and standards (p21).

Transitional provisions set a timetable for the next control period (FY 2025-26 to FY 2029-30), including DR potential assessment for FY 2026-27 to FY 2029-30 and submission of the DR program document by 30 November 2025 (p6, p11–12).

Standard name
Demand Side Management and Demand Response
Primary topics
Demand-side management and demand response

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document