AERC · Assam Electricity Regulatory Commission
Demand Response Regulations, 2024
AERC (DEMAND RESPONSE), REGULATIONS 2024
RegulationDated 19 Dec 2024Published in the Gazette 21 Jan 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Assam Electricity Regulatory Commission (Demand Response) Regulations, 2024 (AERC No.929/2024/17) create a framework for demand response (DR) in Assam. Made under s.181(2)(zp) of the Electricity Act, 2003, they apply to all distribution licensees, aggregators and all categories of consumers connected to the state grid, and extend to the whole of Assam (p4). They commence on publication in the Official Gazette (p1).
Chapter I defines key terms such as aggregator, demand response, distributed generation, prosumer, control period, ancillary services and evaluation, measurement and verification, and sets applicability (p1–4). Chapter II states objectives — integrating DR into daily DISCOM operations, load shifting, peak reduction, cost optimisation, Time-of-Use pricing, network security, ancillary services and renewable/distributed generation integration — and requires DISCOMs to assess DR potential and the Commission to set targets; it also allows the Commission to issue DR guidelines (p5–7). Chapter III requires a Demand Response Cell, ordinarily the existing DSM Cell, headed by a Chief General Manager, with defined functions from potential assessment to reporting and data protection (p8–9).
Chapter IV sets the DR process: baseline study and potential estimation, development of a program document with specified contents, review and approval alongside MYT/APR processes, execution, and cost-recovery mechanisms (p10–13). Chapter V covers monitoring, completion reports and evaluation, measurement and verification, including possible third-party verification (p14–15). Chapter VI adopts CEA/BIS and, where absent, IEC/IEEE/ANSI standards for systems, networks, communications and products, and sets customer data protection standards distinguishing PII and CEUD, with testing and certification requirements (p15–17). Chapter VII deals with customer participation and incentives, including opt-in/opt-out, ToU/RTP/CPP tariffs, and awareness and capacity building (p17–18). Chapter VIII contains miscellaneous powers — orders and practice directions, removal of difficulties, relaxation, interpretation, amendment and inherent powers (p19–20). Annexure A lists indicative CEA regulations, guidelines and standards (p21).
Transitional provisions set a timetable for the next control period (FY 2025-26 to FY 2029-30), including DR potential assessment for FY 2026-27 to FY 2029-30 and submission of the DR program document by 30 November 2025 (p6, p11–12).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.