Summary
Summary written by software. Check the regulator's original before you rely on it.
UPERC issues this Removal of Difficulty order to clear up two practical problems in the way Green Energy Open Access (GEOA) is metered and paid for under its Open Access Regulations. The first four pages are recitals: the Commission traces the 2019 Open Access Regulations notified on 10 December 2019 and their First Amendment of 16.12.2024, notes the Ministry of Power's Green Energy Open Access Rules, 2022, records representations on metering, application fee and registration fee, and explains that the CEA (Installation and Operation of Meters) Amendment Regulations, 2026 took effect from 1 April 2026 (p1–4). It invokes Regulation 38 (Power to Remove Difficulties) of the Open Access Regulations as its authority (p4).
The operative part (p4–6) has four clauses. Clause 1 gives the short title and commencement — in force from the date of issue (p4). Clause 2 substitutes Regulation 29.6 so that interface metering follows the CEA metering regulations rather than the 2010 connectivity regulations, with a proviso making check meters optional at voltage up to 650 Volts and the open access consumer bearing the meter cost (p4). Clause 3 rewrites the second proviso to Clause 2.3(ii) of Schedule-A: a Lead GEOA Consumer pays the application fee on behalf of its constituent consumers, and must file a fresh application if the green energy source changes (p5). Clause 4 rewrites the proviso to Clause 2.1 of Schedule-B, capping the SLDC registration fee payable by a Lead GEOA Consumer and overriding the 2025 SLDC Fees and Charges Regulations to that extent, with a similar fresh-application trigger on change of source (p5–6).
It binds open access consumers, Lead GEOA consumers, distribution licensees, the STU and SLDC in Uttar Pradesh, and takes effect immediately on issue.
Read with this
Voltaic does not hold the regulation itself.
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.