Skip to content

JSERC · Jharkhand State Electricity Regulatory Commission

Merit Order Dispatch & Optimization of Power Purchase Cost Regulations, 2024

JSERC (Merit Order Dispatch & Optimization of Power Purchase Cost) Regulations, 2024

Draft regulationDated 9 Aug 2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Jharkhand State Electricity Regulatory Commission's Merit Order Dispatch and Optimisation of Power Purchase Cost Regulations, 2024 lay down how power in the state is stacked, scheduled, backed down and revived so that distribution licensees buy electricity in least-cost order. They bind SLDC, every distribution licensee in Jharkhand and generating companies, including captive plants, that supply distribution licensees; must-run plants are carved out (p1, p4).

Regulation 2 (pp1–4) defines the working vocabulary — MOD stack, merit order despatch, variable charges, must-run plants, technical minimum, AC-UBC, transfer capability — and borrows many definitions from the CERC Indian Electricity Grid Code, 2023; where the IEGC and the State Grid Code conflict, the IEGC prevails as the Commission views it. Regulation 3 (pp4–6) makes the distribution licensee verify generators' variable costs and build the merit order stack at the state periphery, adding inter-state transmission losses and common AC-UBC charges, and lets SLDC revise the stack on new supply arrangements, revised tariff orders or change in law. Regulation 4 (pp6–7) sets the fortnightly preparation calendar and the SLDC website upload.

Regulation 5 (pp7–9) states the dispatch principles: power balance, cost minimisation, avoidance of load curtailment, minimum thermal units online, ancillary service adequacy, regulatory and system constraints, and market opportunities, with SLDC preparing a centralised stack. Regulations 6 to 9 (pp9–14) cover capacity and ramp-rate declaration with misdeclaration reporting and penalties, 'zero schedule' of contracted units, reserve shut down and revival from it, including start-up times by machine condition. Regulation 10 (p14) fixes the technical minimum for intra-state thermal units and the compensation route for units run below normative availability, with the CERC IEGC 2010 methodology applying in the interim. Regulations 11–15 (pp14–15) are the Commission's standard inherent, relaxation, difficulty-removal, amendment and interpretation powers. Annexures I–III (pp15–16) give the stack, misdeclaration and reserve-shutdown reporting formats.

Standard name
Power Procurement Regulations
Primary topics
Power procurement and PPAs, Scheduling and despatch, Grid operation and grid code

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document