JSERC · Jharkhand State Electricity Regulatory Commission
Merit Order Dispatch & Optimization of Power Purchase Cost Regulations, 2024
JSERC (Merit Order Dispatch & Optimization of Power Purchase Cost) Regulations, 2024
Draft regulationDated 9 Aug 2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Jharkhand State Electricity Regulatory Commission's Merit Order Dispatch and Optimisation of Power Purchase Cost Regulations, 2024 lay down how power in the state is stacked, scheduled, backed down and revived so that distribution licensees buy electricity in least-cost order. They bind SLDC, every distribution licensee in Jharkhand and generating companies, including captive plants, that supply distribution licensees; must-run plants are carved out (p1, p4).
Regulation 2 (pp1–4) defines the working vocabulary — MOD stack, merit order despatch, variable charges, must-run plants, technical minimum, AC-UBC, transfer capability — and borrows many definitions from the CERC Indian Electricity Grid Code, 2023; where the IEGC and the State Grid Code conflict, the IEGC prevails as the Commission views it. Regulation 3 (pp4–6) makes the distribution licensee verify generators' variable costs and build the merit order stack at the state periphery, adding inter-state transmission losses and common AC-UBC charges, and lets SLDC revise the stack on new supply arrangements, revised tariff orders or change in law. Regulation 4 (pp6–7) sets the fortnightly preparation calendar and the SLDC website upload.
Regulation 5 (pp7–9) states the dispatch principles: power balance, cost minimisation, avoidance of load curtailment, minimum thermal units online, ancillary service adequacy, regulatory and system constraints, and market opportunities, with SLDC preparing a centralised stack. Regulations 6 to 9 (pp9–14) cover capacity and ramp-rate declaration with misdeclaration reporting and penalties, 'zero schedule' of contracted units, reserve shut down and revival from it, including start-up times by machine condition. Regulation 10 (p14) fixes the technical minimum for intra-state thermal units and the compensation route for units run below normative availability, with the CERC IEGC 2010 methodology applying in the interim. Regulations 11–15 (pp14–15) are the Commission's standard inherent, relaxation, difficulty-removal, amendment and interpretation powers. Annexures I–III (pp15–16) give the stack, misdeclaration and reserve-shutdown reporting formats.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a draft or notice on a draft.