APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Renewable Energy Tariff Regulations, 2024
Arunachal Pradesh State Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2024
RegulationDated 4 Mar 2024Published in the Gazette 11 Mar 2024No. APSERC/NOTIFICATION/ 36/2024 dated The 4th March, 2024
2 amendments to it are on Voltaic, the latest dated 24 Mar 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The APSERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2024 is a principal state regulation notified by the Arunachal Pradesh State Electricity Regulatory Commission (p1). It creates the framework for determining tariffs for renewable energy projects in Arunachal Pradesh and comes into force from publication in the Official Gazette; the Gazette is dated 11 March 2024 and the notification is dated 4 March 2024 (p1). It is made under ss.61, 66 and 86 read with s.181 of the Electricity Act, 2003 (p1).
Chapters 1–2 (p1–3) set the short title, commencement and definitions. Regulation 3 applies the regulations where tariff for RE generating stations or units commissioned during the Control Period is to be determined under s.62 read with s.86; Regulation 4 defines eligible categories and capacity ceilings, while projects above those ceilings, such as wind above 25 MW, solar PV above 5 MW and wind-solar hybrid above 50 MW, are to have tariff adopted under s.63 (p3–4).
Regulation 5 establishes a three-year Control Period from notification, with first year FY2024-25 and last year FY2026-27, and provides for continuation of norms if the next Control Period regulations are not notified (p4). Regulation 6 links the tariff period to useful life. Regulations 7–9 distinguish annual generic tariffs for small hydro up to 1 MW and biogas from project-specific tariffs for other categories, and set out petition requirements, filing fee, DPR contents, subsidy disclosure and distribution licensee consent (p4–5). Regulation 10 makes RE plants must-run and exempt from merit order despatch; Regulations 11–13 deal with tariff structure, levelisation and over-generation treatment, including beneficiary first right of refusal (p5–6).
Chapter 3 (Regulations 14–25, p6–8) lays down financial principles: capital cost, debt-equity ratio, loan tenure and interest, depreciation, return on equity, working capital, CUF/PLF hours, O&M expenses and escalation, rebate, late payment surcharge linked to Ministry of Power rules, subsidy treatment and statutory charges.
Chapters 4–10 (p8–12) contain technology-specific norms. Chapter 4 covers generic small hydro (capital cost, CUF, auxiliary consumption, O&M); Chapter 5 covers generic biogas (capital cost, PLF, auxiliary consumption, O&M, fuel cost and specific fuel consumption); Chapter 6 covers project-specific small hydro; Chapter 7 covers project-specific wind and then a second Chapter 7 covers project-specific solar PV; Chapter 8 covers MSW/RDF; Chapter 9 covers RE hybrid; and Chapter 10 covers RE with storage (capital cost, storage efficiency, O&M and composite or time-of-day tariff). Chapter 11 (Regulations 64–68) covers deviation from norms, power to relax, removal of difficulties, amendment, and repeal/savings of the 2018 RE tariff regulations (p12).
The annexures and forms (p13–18/20) provide templates for assumptions and levellised tariff computation for small hydro/solar/wind, biogas/MSW/RDF and tariff computation. There are internal numbering defects, so the Gazette original should be checked for those parts (p3, p9–12, p16–20).
Read with this
Amendments and corrections
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.