RegulationDated 7 Sep 2015Published in the Gazette 9 Sep 201546 dated 07th September, 2015
Summary
Summary written by software. Check the regulator's original before you rely on it.
Notification No. 46 of 7 September 2015, published in the Jharkhand Gazette on 9 September 2015 (p1), makes a fresh set of distribution standards of performance for Jharkhand, replacing the 2005 regulations of the same name. It binds every licensee engaged in distribution of electricity in the state, including deemed licensees (p1).
Chapters A1–A3 set the framework: commencement on gazette publication, the amendment process (proposed changes to be circulated to licensees and the public and published on websites and in newspapers), repeal of the 2005 regulations with savings for past actions, definitions keyed to the Electricity Act and to area categories (Class-I cities, urban, rural) and voltage bands (LT/HT/EHT) (p1–4), and the statutory basis — sections 57, 58, 59, 86(1)(i) and 142 of the Act, covering the licensee's liability to compensate affected persons, the Commission's power to prescribe different standards for classes of licensees, and penal action against responsible officers (p4–5).
Chapter A4 splits the standards into two families: Guaranteed Standards in Schedule I, the minimum service levels that must be maintained, and Overall Standards in Schedule III, which licensees must achieve within prescribed time frames (p5). Chapter A5 makes failure to meet a guaranteed standard a compensation liability, sets the payment mechanics, and creates an annual audit regime — panel of approved agencies, rotation restrictions, and grading of data reliability and accuracy, with recovery of compensation in the licensee's revenue requirement tied to the accuracy grade (p5–8). Chapter A6 sets quarterly and annual reporting and website disclosure duties; A7 requires a published manual of complaint-handling practice, round-the-clock call centres within defined outer limits, and consumer awareness steps; A8 defines what counts as a power interruption and exempts licensees for force majeure and for transmission- or load-despatch-caused failures; A9 gives the Commission powers to issue practice directions, relax provisions and remove difficulties (p8–12).
Schedule I specifies the guaranteed standards — call-centre response and registration, restoration times for fuse-off, overhead and underground breakdowns and transformer failures, scheduled-outage notice and caps, voltage variation limits and rectification timelines, harmonics limits in three stages, meter testing and replacement, new connections, bill complaints and reconnection (p12–15). Schedule II prescribes the compensation payable per default and the manner of payment, including that compensation must be claimed by the consumer within a short window (p16–18). Schedule III sets the overall percentage-achievement standards and introduces reliability indices SAIFI, SAIDI and MAIFI based on IEEE Standard 1366 of 1998, computed for 11 kV feeders excluding agricultural feeders, with targets to be notified by the Commission (p19–21). Annexures I–III give reporting and complaint-registration formats (p22–29), and the Appendix benchmarks JSERC's timelines and compensation against other states and the Forum of Regulators model (p30–35).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.