HERC · Haryana Electricity Regulatory Commission
Renewable Energy Tariff, RPO and REC Regulations, 2025
Haryana Electricity Regulatory Commission (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2025
RegulationDated 29 Oct 2025Published in the Gazette 4 Nov 2025In force from 1 Apr 2026
Summary
Summary written by software, from pages 1 to 32 of 43. Check the regulator's original before you rely on it.
The Haryana Electricity Regulatory Commission made these principal regulations on 29 October 2025 (p1), notified in the Haryana Government Gazette on 4 November 2025 (p1). They come into force on 1 April 2026 and remain in force up to 31 March 2029 unless reviewed earlier or extended (p1), with the Control Period set as FY 2026-27 to FY 2028-29 (p9). They apply to grid-connected renewable energy projects and obligated entities in Haryana (p1).
Chapter 1 (p1–9) contains definitions and eligibility criteria. It defines the RE technologies, financial terms and 'obligated entity' — distribution licensees, open access consumers, and fossil-fuel captive/co-generation plants of 5 MW and above (p4). Eligibility rules require new plant and machinery and MNRE acknowledgement, with technology-specific conditions (p7–9).
Chapter 2 (p9–18) sets general norms: control and tariff periods, project-specific tariff route, petition requirements including forms, tariff structure and levelisation design, must-run status for most RE except biomass 10 MW and above (p12), and financial norms for capital cost, debt-equity, loan interest, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, CDM and other income sharing, subsidy adjustment and statutory charges.
Chapters 4–13 (p18–28) give technology-specific parameters. Wind (p18–19) has CUF bands by wind power density but project-specific capital cost and O&M. Small hydro (p19–20) has capital cost and O&M by size, CUF and auxiliary consumption. Biomass (p20–22) covers capital cost by condenser/fuel, PLF, auxiliary consumption, SHR, O&M, fuel mix rules with fossil fuel prohibited, calorific value and fuel cost. Cogeneration (p22–23) sets capital cost, PLF, auxiliary consumption, SHR, calorific value and fuel prices. Solar PV (p23–24) does not get generic tariff; only project-specific tariff, if required, with a reverse bidding option. Biomass gasifier (p24–25), biogas (p25–26), RDF-MSW (p26–27), renewable hybrid (p27–28) and RE with storage (p28) each have their own capital cost, PLF/CUF, auxiliary consumption, fuel or storage efficiency, O&M and tariff treatment.
Chapter 14 (p28–30) covers RPO/RCO/RGO and RECs: obligated entities must comply with the Ministry of Power trajectory from FY 2026-27, with an option for FY 2025-26 between the HERC 2021/2022 trajectory and the MoP trajectory (p28–29). It designates HAREDA as State Agency, provides for REC purchase and default consequences including fund deposits and open-access denial (p29–30). Regulations 67–68 (p31–32) allocate evacuation cost up to and beyond 10 km and set the discount factor. Chapter 15 (p32) contains deviation, relaxation, amendment and removal-of-difficulty powers.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.