Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Rajasthan Electricity Grid Code, 2024

Rajasthan Electricity Regulatory Commission (Rajasthan Electricity Grid Code) Regulations, 2024

CodeDated 29 Oct 2024No. RERC/Secy/Reg –155 .- dated October 29, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software, from pages 1 to 89 of 123. Check the regulator's original before you rely on it.

The notification at p59 makes the Rajasthan Electricity Grid Code, 2024 — No. RERC/Secy/Reg–155, dated Jaipur, 29 October 2024 — under s.181 read with s.86(1)(h) of the Electricity Act, 2003. It binds Users connected at 33 kV and above to the intra-state transmission system, and the SLDC; it also reaches new connections and equipment procured for new works or replacements once the code takes effect, and comes into force on gazette publication (p59–60).

Part I sets applicability and a long definitional base for the whole code — operational states, ancillary services, deviation and DSM, energy storage, renewable hybrid stations, primary and secondary reserve, gaming, and the pivotal term 'User' (p60–66). Part II requires the code to be consistent with the CERC Indian Electricity Grid Code but gives IEGC primacy where the two conflict on intra-state transmission; it sets SLDC and STU duties, tells SLDC to frame a Load Despatch and System Operation Manual for RERC approval, and creates the State Power Committee with its membership, responsibilities and quarterly meetings, with SLDC as monitoring agency for user compliance (p66–68).

Part III, the resource planning code, splits integrated resource planning into demand forecasting, generation resource adequacy (delegated to the RERC power-procurement regulations and CEA's resource adequacy guidelines) and transmission planning, with STU rolling 5/10/15-year plans, annual data-submission and publication deadlines, and prescribed study techniques (p68–71). Part IV, the connection code, fixes connection points by user category, requires STU to propose a connectivity procedure for RERC approval, and covers connection agreements, site responsibility schedules and an annual State Grid asset schedule (p71–74). Part V covers protection protocols, protection audit plans, system protection schemes and disturbance recorders (p74–75).

Part VI is the largest part: start-up and infirm power windows, data required before trial run, trial-run rules by technology (thermal, hydro, wind/solar/ESS/hybrid, transmission), documents and tests before COD, the certificate of successful trial run, declaration certificates, and COD/DOCO rules including deemed COD for competitively bid transmission (p75–88). Part VII opens the operating code — operating philosophy, control-room manning and coordination centres, and system security rules on when grid elements may be isolated and how quickly that must be reported (p88–89).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Connectivity and GNA, Network planning and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document