MPERC · Madhya Pradesh Electricity Regulatory Commission
Supply and Wheeling Tariff Regulations, 2021 — Second Amendment, 2023
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of Charges) (2nd Amendment) Regulations, 2021 {ARG-35(III)(ii) of 2023}
AmendmentDated 7 Dec 2023No.2735/MPERC 2023 dated 7th December 2023
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Supply and Wheeling Tariff Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to MPERC's 2021 Supply and Wheeling Tariff Regulations, issued from Bhopal on 7 December 2023 and applying to the whole of Madhya Pradesh (p1). It is a working amendment: eighteen clauses that rewrite specific provisions of the Principal Regulations and replace one reporting format, rather than a self-contained code.
Its centre of gravity is loss measurement and loss incentives. Regulation 18.2(a) is replaced with a definition of AT&C loss variation that ties units realised to billing and collection efficiency (p2), Regulation 20 is wholly substituted with a gains/losses sharing mechanism for controllable factors — O&M variation handled through Regulation 36, and deviation from the approved AT&C trajectory quantified in terms of Average Power Purchase Cost and shared two-thirds/one-third between the DISCOM and consumers, with the detailed pass-through methodology to be prepared by the DISCOM and approved by the Commission first (p2). Regulation 26.1 and 26.2 are replaced to lay out, per DISCOM, a distribution-loss reduction trajectory for FY 2022-23 and FY 2023-24 and a combined AT&C loss, billing efficiency, collection efficiency and distribution-loss trajectory for FY 2024-25 to FY 2026-27 (p3–4). The words "Distribution Loss" are swapped for "Distribution/Aggregate Technical & Commercial (AT&C) Losses" across Regulations 26.4, 26.5, 26.6 and the heading of Regulation 26 (p3–4), and "distribution losses" becomes "losses" in Regulations 27.1 and 45(c) (p4–5).
Other threads: the FPPAS formula is reworded so that C includes change of fuel cost and refers to the loss tables under both Regulations 26.1 and 26.2, and "FCA" is renamed "FPPAS" in Regulations 11 and 26.9 (p1–2, p4). A new Regulation 24.1A makes prudent distribution-system capex a tariff pass-through, conditional on the asset being in the Commission-approved Capital Investment Plan, competitively procured, and geo-tagged in the Fixed Asset Register (p3). Regulation 27.2 hands the Power Procurement Plan for the Control Period to the MPERC Power Purchase and Procurement Process Regulations, 2023 (p5). Regulation 36.4 sets the R&M expense allowance on opening GFA by DISCOM and adds two incentive tranches — one for hitting Commission performance standards and one for meeting the loss trajectory or a year-on-year loss reduction (p5). Annexure-I's FAR format is replaced with a new asset-acquisition template (p5–6).
Read with this
The regulation
- Dated 25 Nov 2021Supply and Wheeling Tariff Regulations, 2021
Amendments and corrections
- Dated 18 Jun 2025Supply and Wheeling Tariff Regulations, 2021 — Third Amendment, 2025
Procedures and orders made under it
Other copies of these documents (1)
8 more documents belong here and are not on Voltaic: 8 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.