Single Point Supply to Employers' Colonies, Group Housing Societies and Residential/Commercial Complexes of Developers, Industrial Estates/IT Parks/SEZ Regulations, 2020
Haryana Electricity Regulatory Commission (Single Point Supply to Employers' Colonies, Group Housing Societies and Residential or Residential cum Commercial/ Commercial Complexes of Developers and Industrial Estates/ IT parks/SEZ) Regulations, 2020.
RegulationDated 22 Apr 2020HERC/49/2020 dated 22nd April 2020
Summary
Summary written by software. Check the regulator's original before you rely on it.
The 2020 Regulations replace HERC's 2013 single-point supply framework. They set out when a distribution licensee may supply an entire walled or fenced residential, commercial or industrial colony/complex at one point for onward supply by an employer, group housing society (GHS), developer, RWA or users' association (pp1, 4, 21). The Statement of Objects and Reasons records the problems found in existing colonies — inadequate developer infrastructure, RWAs charging tariffs above Commission-approved rates, common area maintenance (CAM) charges being clubbed with electricity and causing disconnection, unmetered common/NDS loads, and defective meters — and the Commission's responses: infrastructure before connection, no tariff above the Commission's, CAM not to be clubbed with grid supply charges, prepaid recovery if separately shown, and standard metering (pp1–3).
Operative Regulations 1–5 cover title, Gazette commencement, application to Haryana, definitions, single-point supply to employers' colonies with 20 or more residential units at 11 kV or higher, existing colonies to be converted, GHS options for single-point or individual supply with a reference meter and energy-difference reconciliation, single-point supply to government/defence/rail/SEZ/DMRC establishments, and to commercial complexes, malls, industrial estates and IT parks; they also give individual consumers the rights of ordinary distribution consumers (pp4–10).
Regulation 6 is the operational core: application, approved electrification plan and bank guarantee, metering/billing/collection duties, security deposits, phase-wise development, standby power, tariff compliance, conversion of existing colonies, developer/association agreements, billing under bulk domestic and NDS categories with apportionment, rebates, part payment, disconnection, backup DG metering, meter testing and information duties (pp10–20). Regulations 7–9 continue existing single-point connections, exclude consumers opting for smart prepaid meters, and allow rooftop solar and open access with restrictions (pp20–21). Regulations 10–13 cover miscellaneous orders, difficulty removal, amendment and repeal of the 2013 Regulations (p21). Annexure-1 is the undertaking form for the GHS individual-connection option (pp22–23); Annexure-2 is the billing/apportionment method and worked examples for mixed domestic and NDS loads (pp24–28).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.