DERC · Delhi Electricity Regulatory Commission
Renewable Purchase Obligation and REC Framework Implementation Regulations, 2020 — Draft
Delhi Electricity Regulatory Commission (Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation) Regulations, 2020
Draft regulationDated 19 Oct 2020F.3(600/Tariff-Fin./DERC/2019-20/6705 dated 19/10/2020
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft of the Delhi Electricity Regulatory Commission's 2020 regulations for implementing Renewable Purchase Obligation (RPO) and the Renewable Energy Certificate (REC) framework in the National Capital Territory of Delhi, dated 19/10/2020 and issued for previous publication (p2). It is made under s.181 read with ss.61(h), 66 and 86(1)(e) of the Electricity Act 2003, and would replace the Commission's 2012 RPO/REC Regulations, which stand repealed on commencement with a savings clause preserving past actions (p14).
Part 1 (pp2–5) sets the title, commencement, territorial extent and the three classes of obligated entity — distribution licensees, captive users above 1 MW using non-renewable sources, and open access consumers with contract demand above 1 MW sourcing non-renewable power — then defines the terms the rest of the document uses, largely by reference to CERC's REC Regulations 2010 and the 2005 Open Access Regulations.
Part 2 (pp6–14) is the operative body. Regulation 4 fixes annual RPO targets split into solar and non-solar components, with the final year's targets continuing until changed, and permits limited cross-adjustment between the two components once one reaches 85% compliance (p6). Regulation 5 states what does and does not count towards RPO — REC-registered purchases excluded, net-metering generation and bundled RE-coal power counted, mandatory procurement from waste-to-energy plants (pp6–7). Regulation 6 assigns the State Nodal Agency its accreditation, data-collection and monthly/quarterly reporting duties (pp7–8). Regulations 7 and 8 set out parallel compliance processes for open access consumers and captive users: projections, Bank Guarantee/FDR sizing against the REC price band, deposit and release timelines, encashment on shortfall and purchase of RECs by the distribution licensee (pp8–12). Regulation 9 covers the distribution licensee's cost recovery through ARR and its reporting duties; Regulation 10 the carry-forward of surplus and relief for genuine difficulty; Regulation 11 the one-time choice between tariff and REC pricing (pp12–14).
Part 3 (pp14–15) carries the powers to relax, amend and remove difficulties, and the repeal and savings provisions.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.