Skip to content

DERC · Delhi Electricity Regulatory Commission

Renewable Purchase Obligation and REC Framework Implementation Regulations, 2020 — Draft

Delhi Electricity Regulatory Commission (Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation) Regulations, 2020

Draft regulationDated 19 Oct 2020F.3(600/Tariff-Fin./DERC/2019-20/6705 dated 19/10/2020

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft of the Delhi Electricity Regulatory Commission's 2020 regulations for implementing Renewable Purchase Obligation (RPO) and the Renewable Energy Certificate (REC) framework in the National Capital Territory of Delhi, dated 19/10/2020 and issued for previous publication (p2). It is made under s.181 read with ss.61(h), 66 and 86(1)(e) of the Electricity Act 2003, and would replace the Commission's 2012 RPO/REC Regulations, which stand repealed on commencement with a savings clause preserving past actions (p14).

Part 1 (pp2–5) sets the title, commencement, territorial extent and the three classes of obligated entity — distribution licensees, captive users above 1 MW using non-renewable sources, and open access consumers with contract demand above 1 MW sourcing non-renewable power — then defines the terms the rest of the document uses, largely by reference to CERC's REC Regulations 2010 and the 2005 Open Access Regulations.

Part 2 (pp6–14) is the operative body. Regulation 4 fixes annual RPO targets split into solar and non-solar components, with the final year's targets continuing until changed, and permits limited cross-adjustment between the two components once one reaches 85% compliance (p6). Regulation 5 states what does and does not count towards RPO — REC-registered purchases excluded, net-metering generation and bundled RE-coal power counted, mandatory procurement from waste-to-energy plants (pp6–7). Regulation 6 assigns the State Nodal Agency its accreditation, data-collection and monthly/quarterly reporting duties (pp7–8). Regulations 7 and 8 set out parallel compliance processes for open access consumers and captive users: projections, Bank Guarantee/FDR sizing against the REC price band, deposit and release timelines, encashment on shortfall and purchase of RECs by the distribution licensee (pp8–12). Regulation 9 covers the distribution licensee's cost recovery through ARR and its reporting duties; Regulation 10 the carry-forward of surplus and relief for genuine difficulty; Regulation 11 the one-time choice between tariff and REC pricing (pp12–14).

Part 3 (pp14–15) carries the powers to relax, amend and remove difficulties, and the repeal and savings provisions.

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), ARR and true-up

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document