Skip to content

CERC · Central Electricity Regulatory Commission

Thermal Tariff Filing Forms for Determination of Tariff — Main Tariff Form Part-I (Annexure-I)

TARIFF FILING FORMS (THERMAL) FOR DETERMINATION OF TARIFF Main Tariff Form PART-I Annexure-I

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 61 of 78. Check the regulator's original before you rely on it.

This is Part-I (Annexure-I) of the CERC's main tariff filing forms for thermal generating stations. It is a set of blank templates with checklists and disclosure notes, not a statement of normative tariff values.

Pages 2–4 are the checklists. They list the Main Tariff Forms (Form-1 to Form-20), the supporting forms (Form-A to Form-T) and the supporting documents that a generating company must file. Page 5 requires electronic filing and a pen drive/flash drive copy.

Pages 6–18 cover the tariff summary and return on equity. Form-1 summarises cost heads and fuel/energy-charge data for each year; Form-1(I) shows claimed capital cost; Form-1(IIA) and Form-1(IIB) show return on equity at normal rate and at an SBI MCLR-linked rate. Form-2 records plant characteristics, Form-3 normative parameters, and Forms 4 and 4A foreign loans and foreign equity.

Pages 19–34 deal with capital cost and financing. They cover admitted capital cost, financial package up to COD, project-specific and corporate loan allocation, additional capitalisation after COD, depreciation, weighted-average interest on actual loans, and the draw-down schedule for IDC and financing charges.

Pages 35–44 collect fuel and operating-cost inputs: source-wise fuel for energy charges, limestone, capital spares, non-tariff income, water charges and statutory charges.

Pages 45–61 begin the supporting forms for new projects: Form-A capital cost estimates and commissioning schedule, Form-B coal/lignite capital-cost break-up, Form-C gas/liquid capital-cost break-up, Form-D construction/supply/service packages, the variables and optional-package form, and Form-F cost-overrun details (only partially supplied).

The forms do not set values. They require disclosures tied to the 2024-29 tariff period, the 2019-24 true-up in 2024-25, and the underlying 'Regulation', Regulations 31 and 43 and CERC's depreciation schedule.

Standard name
Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document