JSERC · Jharkhand State Electricity Regulatory Commission
Energy Conservation and Demand Side Management Regulations, 2024
Jharkhand State Electricity Regulatory Commission (Energy Conservation and Demand Side Management) Regulations, 2024
Draft regulationDated 9 Aug 2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the JSERC's principal regulation for energy conservation and demand side management in Jharkhand, made under clause (zp) of s.181(2) of the Electricity Act, 2003 and applying to all distribution licensees and entities engaged in supplying and distributing electricity in the State (p1). It comes into force on publication in the Jharkhand Gazette, a date the text does not print (p1).
Chapter I makes the Commission the setter of year-wise energy and peak-saving targets by order, based on licensees' proposed DSM plans and on BEE objectives, and obliges each licensee to assess DSM potential a year before each MYT control period — the first assessment within six months of notification — and to file an annual DSM plan alongside its tariff petition, plus quarterly progress reports (p4). Chapter II requires every licensee to constitute a DSM Cell within three months and lists its functions: potential assessment, load research, baseline building, capacity building, project design, EM&V, plan formulation and consumer awareness; DSM programs may be delivered in-house or through BEE-empanelled ESCOs, and may span street-lighting retrofits, agriculture pumping, LED and fan replacement, solar PV and awareness campaigns (p5–7).
Chapter III covers implementation: energy audits by BEE-empanelled ESCOs, measurement and verification consistent with BEE standards, cost-benefit analysis on life-cycle cost including non-energy benefits, and a cost-recovery route through tariff conditional on prior approval and cost-effectiveness (p7–9). Chapter IV sets out demand response — time-of-use rates, critical peak pricing, peak time rebates and interruptible load — requiring approved demand response plans and a separate Program Document for each program before implementation (p10–11). Chapters V–VII cover Commission monitoring and compliance, six-monthly and program-completion reporting, incentives, disallowance of expenditure for missed targets, dispute resolution, and the Commission's inherent, relaxation, difficulty-removal and amendment powers (p12–15).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.