Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Distribution Code, 2009

the Himachal Pradesh Electricity Distribution Code, 2009

CodeDated 1 Jan 2009No. HPERC/ Reg/ No. 392.- dated 1 st January 2009

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 30 of 62. Check the regulator's original before you rely on it.

The document is the Himachal Pradesh Electricity Distribution Code, 2009, notified by HPERC on 1 January 2009 (p1). It is made under section 181 read with section 42(1) and section 86(1)(c), (e) and (i) of the Electricity Act 2003. It applies to distribution system participants: distribution licensees (including deemed licensees), persons exempt under section 13, embedded/captive generators, large consumers with connected load above 500 kW, and open access customers connected to the distribution system (p1). It extends to the whole State and comes into force from publication in the Rajpatra, Himachal Pradesh; the Gazette date is not printed (p1).

Chapter 1 (pp1–6) gives the framework: short title, applicability, commencement, extensive definitions, interpretation rules, objectives, scope, implementation and non-compliance consequences, limitations, confidentiality, and dispute settlement through the review panel and the Commission.

Chapter 2 (pp7–9) creates a standing Distribution Code Review Panel. It provides for composition, term, functions, six-monthly meetings, a formal review and amendment route, and an exceptional provisional-revision route after an emergency special meeting.

Chapter 3 (pp10–21) is the planning and standards chapter. It requires Distribution Planning Procedures, databases and data exchange formats, load research, rolling five-year load forecasts, an opportunity statement, security and adequacy/redundancy standards, power system studies, energy audits, service-area planning, a Standing Committee on design/construction/maintenance, design criteria for lines, standardisation of ratings/layouts/nomenclature, reactive compensation, service mains and metering cubicles.

Chapter 4 (pp22–24) sets connectivity conditions: minimum technical and design criteria, operational labelling, equipment standards, boundary rules for connection/interface points (EHV/HV/LT), application procedure, and required terms of the connection agreement.

Chapter 5 (pp25–30 and beyond) begins the Distribution Operation Code: demand and availability estimation, outage planning, crisis/contingency restoration, demand management and load shedding, interface with CPP/IPP/embedded generators, monitoring of voltage/frequency/power factor/harmonics, safety coordination and Permit to Work, operational communication, consumer call centres, unmanned sub-stations and packaged sub-stations. The pages stop mid-Chapter 5; later chapters and the referenced annexures are not included.

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, Technical standards, Electrical safety

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document