HPERC · Himachal Pradesh Electricity Regulatory Commission

Transmission Performance Standards Regulations, 2023

Himachal Pradesh Electricity Regulatory Commission (Transmission Performance Standards) Regulations, 2023

RegulationDated 2 Mar 2023No. HPERC/H(1)/39 dated the 2nd March, 2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's principal regulation setting minimum transmission performance standards for the State's transmission licensees. Issued as Notification No. HPERC/H(1)/39 at Shimla on 2 March 2023 under s.181(1) and s.181(2)(za)–(zb), read with ss.30, 57, 58, 59 and s.86(1)(i) of the Electricity Act 2003 and Rule 3 of the Electricity (Procedure for Previous Publication) Rules 2005 (p1). It applies to all licensees engaged in transmission of electricity in Himachal Pradesh — presently HPPTCL (p1, p3) — and comes into force on publication in the Rajpatra, Himachal Pradesh; the Gazette date itself is not printed (p1).

Chapter I (p1–3) carries the short title, commencement and applicability, and defines the operative vocabulary: affected person, availability, delivery/interconnection point, EHV, force majeure, grid code, intra-state transmission system, STU, SAIDI, SAIFI, state transmission system, transmission licensee and user, with undefined terms falling back to the Act, Rules or other Commission regulations.

Chapter II (p3–7) is the operative core. Regulation 4 prescribes three standards — transmission system availability, reliability indices, and restoration time — as minimums. Availability norms for recovery of annual transmission charges and incentives are not set here but referred to the Transmission Service Agreement or the HPERC (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 (p4). SAIFI and SAIDI are defined by formula and are to be computed monthly for each voltage class at EHV substations, with specified interruptions excluded, and not to exceed the limits in Table-1 (p4–5). Restoration times for defined failure classes of lines, transformers and reactors are given in Table-2, differentiated by terrain and season (p5–6). Regulation 5 makes exceeding a restoration-time limit a compensation liability to an affected person, while availability/reliability failures are penalised under the tariff regulations; Regulation 6 gives the petition route and the compensation quantum (p6–7).

Chapter III (p7) requires transmission licensees to report performance, restoration-time breaches and compensation paid to the Commission in prescribed formats twice a year, and to publish monthly performance and compensation on their websites; it also provides for an annual review by a Commission-designated nodal agency or committee and for relaxation of any standard during force majeure (p7–8).

Chapter IV (p7–8) contains the Commission's powers to remove difficulties, amend the Schedule by gazette order, and grant relaxations, plus an overriding effect over inconsistent Commission regulations. The annexed Schedule (p9–11) supplies the reporting formats for outages, availability, SAIFI/SAIDI, restoration times and compensation.

Standard name
Standards of Performance
Primary topics
Standards of performance, Transmission availability and outages

Read with this

Commencement notices and reasons

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.