APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Grid Interactive Distributed Renewable Energy Net Metering, Group/Virtual Net Metering, Net Billing and Gross Metering Regulations, 2024

Arunachal Pradesh Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy System with Net Metering including Group Net Metering and Virtual Net Metering, Net-Billing/Net Feed-In, Gross Metering and Its Related Matters) Regulations, 2024

RegulationDated 4 Mar 2024Published in the Gazette 11 Mar 2024No. APSERC/Notification/37/2024 dated The 4th March, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software, from pages 1 to 18 of 26. Check the regulator's original before you rely on it.

The Arunachal Pradesh State Electricity Regulatory Commission issued this principal regulation on 4 March 2024; it was published in the Arunachal Pradesh Gazette on 11 March 2024 and comes into force on Gazette notification (p1). It creates the framework for grid-connected distributed renewable energy (DRE) in Arunachal Pradesh: net metering, group net metering, virtual net metering, net billing/net feed-in and gross metering. It binds the distribution licensee and electricity consumers/prosumers in the State and, under stated conditions, third-party owners/project developers (p1, p4–5).

Regulations 1–2 set commencement, territorial extent and definitions (p1–4). Regulations 3–7 set scope and eligibility: DRE below 33 kV; the distribution licensee must offer arrangements non-discriminatorily on a first-come-first-serve basis; capacity targets for the licensee and distribution transformers; arrangement-specific capacity windows; one arrangement per premises; no pending arrears; and a third-party ownership/leasing framework (p4–5).

Regulation 8 sets interconnection, safety, anti-islanding, inverter/harmonic standards and CEA conformity; Regulations 9–10 cover metering arrangements, meter classes, check meters, AMI and connection/protective-device diagrams (p5–7). Regulation 11 is the core commercial chapter: separate accounting and settlement rules for each arrangement, billing-cycle treatment, carry-forward of credits, ToD treatment, year-end purchase of unadjusted credits, and payment timelines (p7–10). Regulation 12 allocates RPO treatment; Regulation 13 restricts open access for third-party/captive sale; Regulation 14 exempts banking, wheeling and cross-subsidy surcharge; Regulation 15 links REC eligibility to CERC rules (p11).

Regulations 16–17 prescribe the application, technical feasibility, approval, metering and commissioning process, including a processing fee, timelines, compensation for delay, and model connection agreements (p11–13). Regulations 18–27 are administrative: overriding effect over listed APSERC regulations; penalty/compensation; late payment surcharge; powers to remove difficulties, direct, relax, amend; saving of inherent powers; interpretation; and repeal of the 2016 rooftop solar net metering regulations (p13–14).

Annexures 1–3 supplied in this extract provide the distribution-transformer capacity reporting format, harmonic/inverter standards and standards table, and the model net metering connection agreement, though the extract ends mid-agreement.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Gross metering

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.