UPERC · Uttar Pradesh Electricity Regulatory Commission
Conduct of Business Regulations, 2019
Uttar Pradesh Electricity Regulatory Commission (Conduct of Business) Regulations, 2019
RegulationDate not stated
Summary
Summary written by software, from pages 1 to 32 of 64. Check the regulator's original before you rely on it.
This is the Uttar Pradesh Electricity Regulatory Commission's own procedural rulebook — the UPERC (Conduct of Business) Regulations, 2019 — applying to the whole State from the date of publication in the official Gazette (p1). It supersedes the Commission's 2004 Conduct of Business Regulations outright, repealing it at Reg 65(a) while saving everything done under the old regulation (p32).
Chapters 1 and 2 are the operative core. Chapter 1 (Regs 1–9, pp1–6) covers commencement, definitions and interpretation (with the English text prevailing over the Hindi translation), office hours and sittings, the Commission's language and seal, appointment of officers and consultants, and the Secretary's role as nodal officer — custody of the seal and records, receipt and scrutiny of petitions, preparing briefs, authenticating and ensuring compliance with orders. It also lets consumer associations, groups and individual consumers be permitted to participate in proceedings, with provision for a paid consumer representative.
Chapter 2 (Regs 10–26, pp6–18) is the procedural code: initiation of proceedings suo motu or on petition, quorum and voting (including a one-Member quorum where vacancies coincide with leave beyond seven working days), authority to represent, form and content of petitions, mandatory affidavit verification, filing copies and fees, scrutiny and rectification of defects, admission, service of notices, replies, rejoinders and public objections, hearing and evidence, reference of issues to experts, default and ex parte procedure, form and signing of orders, and inspection of records and supply of certified copies.
Chapter 3 (Reg 27, pp18–19) sets the arbitration route for disputes between licensees and generating companies, including arbitrator selection. Chapter 4 (Reg 28, pp19–22) covers investigation, inquiry, information collection, entry, search and seizure, and enforcement — up to cancellation of a licence or a direction to a generating company to cease generation.
Chapters 5–19 (pp23–26) do not set substantive norms. Each names the separate UPERC regulation that governs the subject: licences, tariff, codes and standards, standards of performance, renewable purchase obligation, open access, captive and renewable plants, demand side management, consumer disputes, fees and fines, rooftop solar net/gross metering, solar and wind forecasting and deviation settlement, intra-state transmission connectivity, intra-state ABT/DSM and the State Advisory Committee.
Chapter 20 (Regs 49–65, pp26–32) holds the miscellaneous powers: expert assistance, withdrawal and disposal of petitions, review of orders, continuance of proceedings on death or insolvency, public hearings, penal provisions from the IPC/CrPC, publication of petitions, practice directions, inherent powers, power to amend and to remove difficulties, extension or abridgment of time, non-compliance, costs, fines and penalties and their recovery, enforcement of orders, and repeal and saving. Annexure 1 carries the prescribed forms.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.