Summary
Summary written by software. Check the regulator's original before you rely on it.
What it is. A draft principal regulation of the West Bengal Electricity Regulatory Commission that would govern open access to the intra-state transmission and distribution systems in West Bengal, replacing the Commission's 2007 open access regulations. It is made under s.181 read with s.39(2)(d), s.40(c), s.42(2)–(4) and s.66 of the Electricity Act, 2003, and would take effect on publication in the Official Gazette; the notification number and date are still placeholders (p3, p46). It gives itself overriding effect over earlier regulations and orders (p8).
Scope and access rights. Regulations 3–8 set who may use the systems and on what conditions: coverage of long-term, medium-term and short-term access on the intra-state transmission and distribution systems (p8); eligibility for any licensee, generating company, captive plant, consumer or supplier, subject to a valid connectivity agreement and ABT-compliant meters, with a 24x7 control room required at 132 kV and above, and exclusions for insolvents, defaulters and persons facing prosecution under the Act (p8–9). Existing distribution licensees keep their existing arrangements (p9–10). Regulation 6 ranks allotment priority and Regulation 28 reverses that ranking for curtailment (p10–11, p42).
Procedures. Regulation 8 names the nodal agency for each class of access (p13). Regulations 9–13 prescribe the application format and fees and the processing of long-term access, medium-term open access and short-term open access, including advance reservation, first-come-first-served and day-ahead/same-day windows, trial-run access, and the SLDC's no-objection for power-exchange transactions (p13–24). Regulation 14 ties the applicable access category to the duration of the underlying PPA, and Regulation 15 routes capacity disputes to the Commission (p24). Regulations 16–18 require connectivity, power purchase, open access and bulk power agreements, direct SLDC and STU to draft detailed procedures, and deal with surrender and non-utilisation (p24–30).
Charges and settlement. Regulation 19 lists the charge heads — transmission, wheeling, reactive energy, meter reading, handling and service, SLDC fee, deviation settlement, transmission and distribution system access charges, cross-subsidy and additional surcharge — with transmission and wheeling charges nil for in-state renewable open access (p30–37). Regulations 20–23 cover loss allocation, energy accounting, payment channels and a letter-of-credit security mechanism (p37–39).
Operation and closing. Regulations 25–37 cover metering and accounting, communication facilities, grid discipline, curtailment, licensee network-availability obligations, a public information display by SLDC, obligations under ss.11 and 23, intervention powers, removal of difficulties, dispute resolution, amendment and repeal of the 2007 regulations with savings (p40–46). A Schedule of charges and three formats close the document (p47–57).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.