Skip to content

WBERC · West Bengal Electricity Regulatory Commission

West Bengal Open Access Regulations, 2017 — Draft

West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2017

Draft regulationDated 23 Feb 2017No. xx/WBERC dated xx.xx.2017

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. A draft principal regulation of the West Bengal Electricity Regulatory Commission that would govern open access to the intra-state transmission and distribution systems in West Bengal, replacing the Commission's 2007 open access regulations. It is made under s.181 read with s.39(2)(d), s.40(c), s.42(2)–(4) and s.66 of the Electricity Act, 2003, and would take effect on publication in the Official Gazette; the notification number and date are still placeholders (p3, p46). It gives itself overriding effect over earlier regulations and orders (p8).

Scope and access rights. Regulations 3–8 set who may use the systems and on what conditions: coverage of long-term, medium-term and short-term access on the intra-state transmission and distribution systems (p8); eligibility for any licensee, generating company, captive plant, consumer or supplier, subject to a valid connectivity agreement and ABT-compliant meters, with a 24x7 control room required at 132 kV and above, and exclusions for insolvents, defaulters and persons facing prosecution under the Act (p8–9). Existing distribution licensees keep their existing arrangements (p9–10). Regulation 6 ranks allotment priority and Regulation 28 reverses that ranking for curtailment (p10–11, p42).

Procedures. Regulation 8 names the nodal agency for each class of access (p13). Regulations 9–13 prescribe the application format and fees and the processing of long-term access, medium-term open access and short-term open access, including advance reservation, first-come-first-served and day-ahead/same-day windows, trial-run access, and the SLDC's no-objection for power-exchange transactions (p13–24). Regulation 14 ties the applicable access category to the duration of the underlying PPA, and Regulation 15 routes capacity disputes to the Commission (p24). Regulations 16–18 require connectivity, power purchase, open access and bulk power agreements, direct SLDC and STU to draft detailed procedures, and deal with surrender and non-utilisation (p24–30).

Charges and settlement. Regulation 19 lists the charge heads — transmission, wheeling, reactive energy, meter reading, handling and service, SLDC fee, deviation settlement, transmission and distribution system access charges, cross-subsidy and additional surcharge — with transmission and wheeling charges nil for in-state renewable open access (p30–37). Regulations 20–23 cover loss allocation, energy accounting, payment channels and a letter-of-credit security mechanism (p37–39).

Operation and closing. Regulations 25–37 cover metering and accounting, communication facilities, grid discipline, curtailment, licensee network-availability obligations, a public information display by SLDC, obligations under ss.11 and 23, intervention powers, removal of difficulties, dispute resolution, amendment and repeal of the 2007 regulations with savings (p40–46). A Schedule of charges and three formats close the document (p47–57).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Connectivity and GNA

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document