KERC · Karnataka Electricity Regulatory Commission
Draft Electricity Supply Regulations, 2026 — Consolidated
Draft Karnataka Electricity Regulatory Commission (Electricity Supply) Regulations, 2026
Draft regulationDated 14 Aug 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a draft consolidated electricity supply regulation for Karnataka, published by the Karnataka Electricity Regulatory Commission for stakeholder comment. It proposes to bring the State's supply code and several connected instruments into one framework governing supply of electricity to consumers (p6–9). The preamble sets out the statutory basis, lists the six KERC regulations it would repeal, records the Forum of Regulators' Model Supply Code exercise, and requires distribution licensees to comply with named CEA technical, safety and metering regulations as well as the Electricity (Rights of Consumers) Rules, 2020 and the Karnataka Electricity Distribution Code, 2025 (p6–8). Comments are invited within 30 days of Gazette notification, and the regulations are to come into force on Gazette publication (p8–9).
Chapter I gives the short title, extends the regulations to the whole State, applies them to all distribution licensees, consumers and applicants, and provides for commencement and for forms/annexures (p9). Chapter II defines terms used across the regulation and ends with conversion factors and a rule that definitions in the Electricity Act prevail over the State Reform Act (p9–22). Chapter III classifies supply by voltage and load in Table 1, sets technical-feasibility conditions for HT/EHT supply, deals with augmentation charges, and leaves tariff classification and reclassification to Commission tariff orders (p22–25).
Chapter IV lays down the general procedure for arranging supply: online application, documents, acknowledgement, licensee supply timelines by area type, multiple connections, estimate and power sanction, service line/main duties, inspection and testing, commencement of supply, general conditions, prohibition of resale, telecom supply and self-execution (p25–35). Chapter V gives category-specific procedures for LT installations, irrigation pump sets, LT industrial and commercial connections, HT/EHT installations, commercial/residential and multi-storey buildings, layouts, public lighting, water supply, EV charging and temporary supply (p35–68).
Chapter VI covers consumer wiring, extensions and alterations, load balancing, periodic inspection, supply failures and power-factor obligations for HT/EHT and LT consumers (p68–72). Chapter VII governs metering, meter reading and testing, meter tampering and seals, billing and payment, disputed and defective-meter bills, entry into premises, and disconnection and reconnection (p72–92). Chapter VIII sets the security-deposit regime — initial, additional and meter security deposits, their computation and interest (p92–96). Chapter IX deals with rating, conversion and transfer of installations, reduction of load, surrender and continuing fixed/demand charges (p97–102). Chapter X provides the assessment and penalty framework for unauthorised use, misuse and theft of electricity, and the appeal route to the appellate authority (p103–109). Closing clauses cover repeal and savings, directions, removal of difficulties, amendment and interpretation (p109–110). The Schedule of charges (p111–117) and Annexes 1–4, containing indemnity bonds and the appeal form, complete the draft (p118–121).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.