Levy of Fee and Charges by the State Load Despatch Centre (1st Amendment) Regulations, 2005

Rajasthan Electricity Regulatory Commission (Levy of fee and charges by the State Load Despatch Centre) (1ST Amendment) Regulations, 2005

RegulationDated 15 Dec 2005RERC/ Secy/ Reg/ 42 dated 15th December, 2005

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Rajasthan Electricity Regulatory Commission's first amendment to its regulations on the fee and charges levied by the State Load Despatch Centre, notified at Jaipur on 15 December 2005 (p1). Rather than listing clause-by-clause changes, it sets out the consolidated text of the parent regulations as they read after amendment (p1). It comes into force on publication in the official Gazette; the Gazette date is not printed (p1).

Regulation 1 gives the short title and commencement (p1). Regulation 2 is a residual definitions clause carrying over the meaning of undefined terms from the RERC (Terms and Conditions for Open Access) Regulations, 2004 and the Act (p1). Regulation 3 empowers SLDC to levy and collect fee and charges from generating companies and licensees using the State's transmission and/or distribution system, and operating charges from open access consumers (p1). Regulation 6 requires SLDC to file its proposal for levying these fees along with its statements of accounts (p1).

Regulation 8 governs recovery from generating companies and licensees: the Commission may allow SLDC's reasonable annual expenses to be charged to them and may set an apportionment criterion, with a generating company bearing the whole expense for electricity contracted to open access consumers and to licensees other than in-State distribution licensees; income from open access consumers is deducted first except for a portion the Commission allows SLDC to retain; charges are payable in advance in four quarterly instalments and shared pro rata to contracted capacity on a monthly basis, daily pro rata where capacity changes mid-month (p1–2).

Regulation 9 fixes the operating charge payable by open access consumers — "Rs. 100 per MW of contracted capacity per day subject to a maximum of Rs. 1000 per day" — also in four advance quarterly instalments (p2). Regulation 10 sets schedule-filing obligations and charges: stations of 10 MW and above and licensees file daily, stations of 1 MW up to 10 MW file weekly, stations below 1 MW need not file, and open access consumers file daily drawal schedules, with a per-schedule charge where SLDC prepares a schedule on a defaulter's behalf (p2). Regulation 11 makes SLDC charges additional to CERC-specified inter-state transmission charges where both systems are used (p2).

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Scheduling and despatch

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document