Skip to content

WBERC · West Bengal Electricity Regulatory Commission

West Bengal Co-generation and Renewable Energy Policy, 2012

West Bengal Policy on Co-generation and Generation of Electricity from Renewable Sources of Energy,2012

PolicyDated 5 Jun 2012

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Government of West Bengal's first edition policy on co-generation and renewable energy, issued by the Department of Power & Nonconventional Energy Sources and dated 5 June 2012 (p3–5). It is a state-level policy framework rather than a WBERC regulation, although it repeatedly defers to WBERC regulations and the Electricity Act 2003 (p9–14, p33–35).

After a preamble on RE potential and the National Action Plan on Climate Change (p8), it defines renewable sources, co-generation, DDG, feed-in tariff, RPO, RECs, net metering, nodal agency and related terms (p9–14), and lists acronyms (p15–16). The vision, objectives and scope commit the State to promoting grid-connected and decentralised RE across solar, wind, biomass, co-generation, small hydro, municipal solid waste and other technologies; it supersedes earlier policy guidelines and applies also to projects sanctioned before commencement and already commissioned (p17–18).

Goals set technology-wise capacity targets to 2017 and 2022 (p18–19). Focus-area chapters cover wind, small/mini/micro hydro, biomass, gasifier-based small biomass, waste-to-energy, co-generation and solar PV, including rooftop mandates for certain buildings and a building-code direction (p19–25). DDG electrification is to follow MoP/RGGVY guidelines (p25–26).

Implementation makes WBGEDCL the nodal agency, with WBREDA handling demonstration and off-grid promotion; projects of 2 MW and above are to be competitively bid, smaller projects allotted on an unsolicited basis; biomass clustering, evacuation infrastructure, and project timelines are addressed (p26–31). Land and clearance sections cover government vested land, private land, and a single-window approval process with time limits (p31–32). Financing creates the Green Energy Fund and contemplates budget support (p32–33).

Regulatory issues address open access, wheeling, banking, RPO compliance, RECs, PPAs, implementation agreements, net metering and incentives (p33–36). The remaining sections cover MNRE incentives, CDM benefit sharing, institutional roles, social and environmental obligations, general R&D, and amendment/interpretation powers (p36–40).

Primary topics
Renewable energy tariff, Renewable purchase obligation (RPO / RCO), Net metering

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document