TSERC · Telangana State Electricity Regulatory Commission
Licensee's Duty for Supply of Electricity on Request and Recovery of Expenses — Second Amendment Regulation, 2024 — Draft
Telangana Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request and Recovery of Expenses for Providing Electric line or Electrical Plant) Second Amendment Regulation, 2024
Draft amendmentDated 17 Oct 2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft second amendment by the Telangana Electricity Regulatory Commission to Regulation No.4 of 2013, the Licensee's Duty for Supply of Electricity on Request and Recovery of Expenses for Providing Electric line or Electrical Plant Regulation (p1). The background recounts that the Principal Regulation was notified on 29.07.2013 under sections 43 and 46 of the Electricity Act, 2003, that it applies in Telangana through Regulation No.1 of 2014, and that it was first amended by Regulation No.1 of 2015 (p1). The stated drivers are alignment with the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020, including its treatment of connection charges for electrified areas up to 150 kW, and a request from the TGDISCOMS (p1). Clause 1 names the amendment, extends it to Telangana, and says it comes into force on Gazette publication (p1).
Clause 2 substitutes clause 7.1 of the Principal Regulation (p2–3). New clause 7.1(a) requires the distribution or transmission licensee to collect service line charges for new LT connections or additional load where supply can be released from the existing network and/or requires an extension from existing distribution mains, excluding terminal and metering arrangements. It provides separate charge schedules for LT domestic, LT non-domestic/commercial, LT industries and all other categories, keyed to load slabs and per-kW or part-thereof charges (p2–3). Provisos deal with underground lines, the maximum LT contracted load under the Retail Supply Tariff Order, and the fact that service line charges are additional to application fee, security deposit and development charges (p3). New clause 7.1(b) covers new HT connections requiring line extension: the licensee estimates the service line cost from latest cost data and actual survey and line length, and starts work after receiving the estimated charges (p3).
Clause 3 adds clauses 13 and 14 after clause 12, allowing the Commission to issue orders and practice directions for implementation and to amend, vary or repeal provisions of the Regulation (p3). The draft is dated Hyderabad 17/10/2024 and carries no final regulation number or Gazette date (p3, p1).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.