APERC · Andhra Pradesh Electricity Regulatory Commission

Transmission Standards of Performance Regulation, 2007

Andhra Pradesh Electricity Regulatory Commission (Transmission Standards of Performance) Regulation, 2007

CopyDated 31 Jan 2007Published in the Gazette 31 Jan 2007Regulation No. 1 of 2007 dated 31.1.2007

A copy of the Transmission Standards of Performance Regulation, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Andhra Pradesh Electricity Regulatory Commission's principal regulation fixing standards of performance for the State Transmission Utility and transmission licensee in Andhra Pradesh, published in the A.P. Gazette on 31 January 2007 and in force from that publication (p1). It applies to the whole State and to APTRANSCO as the STU/transmission licensee (p1).

The regulation first defines its vocabulary — Act, APTRANSCO, CEA, Commission, consumer of transmission service, EHV/EHT, Grid Code, IEGC, PGCIL, Rules, State Transmission System and User — and falls back on the Electricity Act, IEGC, the AP Grid Code and the Indian Electricity Rules 1956 for anything undefined (p1–2). Clause 3 states the objective: to keep critical grid parameters within permissible limits so the intra-State transmission system is efficient, reliable and economical, letting Users design their equipment to the electrical environment (p2–3).

Clause 4 splits the standards into Mandatory Standards (voltage variation and safety, whose breach attracts s.57(2)) and Desirable Standards (feeder and sub-station availability, voltage unbalance, neutral voltage displacement, voltage variation index, system adequacy and system security) (p3). Notably, it records that the Rules under s.53 of the Act were yet to be issued by CEA, and that these standards would be revised once they are (p3).

Clause 5 is the operative core: it lays out a three-stage phased implementation — Preliminary (Level 1), Transition (Level 2) and Final (Level 3) — with durations defined from commencement, then specifies each standard, its formula or measurement basis, the stage at which it bites, and the permissible limits (p4–9). Voltage variation limits are given by nominal kV level, safety follows the IE Rules with the licensee to develop its own O&M/safety manual, and system security is tied to an "n-1" single-contingency criterion plus a spinning reserve margin per stage (p5, p9).

Clause 6 covers reporting: half-yearly performance reports to the Commission in the Annexure-A format by 31 October and 30 April, monthly website disclosure, defined half-year periods, electronic submission, and the consequences of default — affected utilities or consumers may seek compensation, determined by the Commission after a hearing and payable within 90 days, without prejudice to penalties under the Act (p9–10). Clause 7 provides for five-yearly review, Commission use of the information, power to amend, savings clauses preserving the Commission's inherent and alternative powers, and relaxation for force majeure or by specific order (p11–12).

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality, Transmission availability and outages

Read with this

The regulation

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.