Skip to content

CERC · Central Electricity Regulatory Commission

Transmission & Communication System Tariff Filing Forms, Part-III

TARIFF FILING FORMS (TRANSMISSION & COMMUNICATION SYSTEM) FOR DETERMINATION OF TARIFF PART-III

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Annexure-I/Part-III of the tariff filing forms for transmission and communication system tariff determination — a filing template, not a tariff order. Pages 1–4 contain the title, index and checklist, listing the forms and supporting documents a petitioner must attach (loan agreements, BPTA/TSA/PPA, DPR, CPM/PERT charts, cost/time-overrun justification, and an electronic copy) (pp2–4). Page 5 gives Form-1, a summary sheet of annual cost components. Pages 6–7 collect asset particulars for transmission lines, substations and communication systems. Page 8 (Form-3) is the normative-parameter sheet covering return on equity, tax, availability, O&M norms, spares, receivables and bank rate. Pages 9–14 (Forms 4, 4A–4C) cover admitted parameters, capital cost, capital works in progress, and capital cost estimates with commissioning schedule for new projects. Pages 15–22 (Forms 5, 5A, 5B) require element-wise and package-wise cost break-ups. Pages 23–26 (Forms 6, 7, 7A–7B) deal with the financial package up to COD, additional capitalisation after COD and fag-end additions. Pages 27–30 (Forms 8, 8A–8B) cover return on equity, foreign equity and additional RoE. Pages 31–41 (Forms 9, 9A–9E) cover allocation of corporate loans, project-specific loans, foreign loans, weighted average interest on actual loans, loans in foreign currency and interest on normative loans. Pages 42–44 (Forms 10, 10A–10B) cover depreciation rate, depreciation statement and de-capitalisation. Page 45 (Form-11) computes interest on working capital. Pages 46–51 (Forms 12, 12A–12B) cover time overrun, incidental expenditure during construction and the draw-down schedule for IDC/financing charges. Pages 52–54 (Forms 13–15) cover initial spares, other income as on COD and actual cash expenditure. No issue date, notification number or in-force clause is printed; the forms refer to regulations (e.g. Regulation 25 at p8, Regulation 13 at p52) and a depreciation schedule (p42).

Standard name
Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Return, financing and working capital

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document