APERC · Andhra Pradesh Electricity Regulatory Commission
Andhra Pradesh Demand Side Management Regulation, 2024
Andhra Pradesh Electricity Regulatory Commission(Demand Side Management) Regulation, 2024.
RegulationDated 27 Nov 2024Published in the Gazette 27 Nov 2024Regulation No.7 of 2024 dated NOVEMBER 27, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Andhra Pradesh Electricity Regulatory Commission (Demand Side Management) Regulation, 2024 — Regulation No. 7 of 2024 — is a principal state regulation creating the framework under which distribution licensees plan, fund, obtain approval for and report on demand side management in Andhra Pradesh. It was published in the Andhra Pradesh Gazette on 27 November 2024 and comes into force from that publication date; it extends to the whole State (p1–2).
Clauses 1–2 give commencement, definitions and interpretation rules, defining DSM, Demand-Side Resource (quantum, time and cost), DSM Resource Acquisition, baseline data, load management, load research and evaluation/measurement/verification (p2–4). Clauses 3–5 state DSM objectives and require each Distribution Licensee to assess DSM technical potential in its supply area before every MYT control period using the Bureau of Energy Efficiency's methodology, with the first assessment due six months from notification; the Commission sets the targets (p4–6).
Clauses 6–9 cover institutions and planning: a DSM Cell with a specified staff composition within one month (p6); load and market research and baseline data building (p7); a perspective DSM Plan for the control period plus rolling annual plans, reviewed and approved by the Commission under the Conduct of Business Regulations (p7–9).
Clauses 10–12 govern delivery — a program document for each programme, prior Commission approval with power to direct modifications, and implementation including 'quick gain' programmes (p9–10). Clauses 13–17 cover money and accountability: identification of net incremental cost, recovery through the ARR, conditions for cost recovery, Commission-directed non-cost-effective programmes, monitoring and reporting, an EM&V plan approved before implementation, six-monthly progress reports, a program completion report, and incentives (p10–13).
Clauses 18–20 give APSECM/APSEEDCO support and awareness roles, constitute a DSM Consultative Committee, and let the Commission disallow expenditure where targets are missed (p13–14). Clauses 21–26 are miscellaneous powers — amendment, removal of difficulty, directions, relaxation, savings, and enquiry through the Conduct of Business Regulations 1999 (p15).
Read with this
Commencement notices and reasons
- Dated 25 Nov 2024Demand Side Management Regulation, 2024 — Statement of Reasons
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.