Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Appointment of Consultants Regulation, 2018

Arunachal Pradesh State Electricity Regulatory Commission (Appointment of Consultants) Regulation, 2018

Published with a draftDated 28 Feb 2018No.APSERC/Notification/…../2018

Draft

Voltaic holds no final regulation made from this draft.

Published with the Notice for Draft Appointment of Consultants Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These 2018 Regulations are the APSERC's replacement framework for engaging consultants to carry out specialised or time-bound work that the Commission's own staff cannot do (p1–2). The notification recites that the 2017 Appointment of Consultants Regulations came into force on 14 February 2017, that review was needed because of the evolving sector, and that the 2018 instrument amends and replaces the 2017 Regulations. It comes into force on the date of publication in the Official Gazette; the Gazette date is not printed (p1). After publication, the 2017 Regulations stand repealed (p1).

Regulation 1 names the 2018 Regulations and deals with commencement and repeal. Regulation 2 defines the Act, Commission, Consultant, Secretary and CEC, with residual definitions drawn from the Electricity Act 2003 and APSERC Conduct of Business Regulations, 2011 (p1). The opening operative paragraphs allow the Commission to appoint consultants for professional and specialised tasks where skills are unavailable in-house or the job is specified or time-bound, with terms of engagement agreed before award (p2).

Regulation 4 states the appointment period is to be specified later for each type of consultant. Regulation 5 categorises consultants as institutional/corporate, individual, staff consultants and professional advisers, and prescribes experience thresholds, qualification rules, limited relaxation powers and headquarters (p2–3). Regulation 6 sets out fees and charges: consolidated fees for individual and staff consultants per Schedule-I, annual escalation and contingent expenditure rules, travel reimbursement under Schedule-IV, leave entitlements, fee treatment for retired government servants, negotiated fees for institutional consultants and mutually agreed fees for professional advisers (p3–4).

Regulation 7 governs institutional/corporate consultant selection: constitution of the Consultancy Evaluation Committee, terms of reference, evaluation weightages, advertised single-stage bids, combined quality-cum-cost evaluation, minimum technical marks, financial-bid opening, negotiations, rejection powers, single-source cases and execution of an agreement (p4–6). Regulation 8 covers individual consultants: advertisement, interview committee, selection by qualifications/experience/interview or references, and initial appointment and extension limits (p6). The staff-consultant appointment procedure covers tenure engagement, interview committee, possible absorption into regular service and bond (p7). Regulation 10 deals with professional advisers, including approval by the Chairman, fee ceiling, and agreement (p7–8).

Later clauses cover conflict of interest, saving of inherent Commission powers, general power to amend/relax, power to remove difficulties, and exercise of Chairperson's powers during a vacancy (p8). Schedules provide fee tables, technical evaluation criteria for institutional consultants, an agreement format for institutional consultants/advisers, and travel entitlements within the country (p9–12).

Standard name
Appointment of Consultants
Primary topics
Commission staff and members

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document