Procedure, Terms and Conditions for Grant of Transmission Licence Regulations, 2019

Jharkhand State Electricity Regulatory Commission (Procedure, Terms &Conditions for the Grant of Transmission Licence and other related matters) Regulations, 2019

RegulationDated 4 Oct 2019Published in the Gazette 10 Oct 201969 dated 4th October, 2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

JSERC's 2019 transmission licensing regulation is the framework for granting, holding, amending and revoking a licence to build and operate intra-state transmission assets in Jharkhand. Notified on 4 October 2019 (Notification No. 69) and printed in the Jharkhand Gazette Extraordinary of 10 October 2019, it comes into force on gazette publication and extends to the whole state (p1–2).

Chapter I (p1–3) explains why the Commission wants a licensing route — future projects may be awarded by tariff-based competitive bidding under s.63, so bidders need a clear procedure — and defines the vocabulary used throughout: applicant, licence, deemed licensee, long-term transmission customer, transmission charges.

Chapter II (p4–8) is the procedure. An intending transmitter applies in the Appendix-I form, pays the fee prescribed under the Conduct of Business Regulations, serves the application on long-term transmission customers and posts it on its website. The STU gets 30 days to recommend against a detailed checklist of planning, cost and system-study matters, though its report is not binding. Then come newspaper public notice, a 30-day objection window, optional local inquiry and hearing, and pre-grant conditions including defence-area clearances. The chapter closes with issue, duration, and the deposit and public inspection of maps.

Chapter III (p9–15) sets the licence conditions: insurance, prudent construction and operation, obedience to SLDC/RLDC directions (with a Commission power to have operations taken over where availability is not maintained), non-discriminatory open access, connection agreements, five-year planning forecasts, prohibitions on mergers, trading and cross-ownership without approval, lenders' right to have the licence assigned on default, and the term and renewal route.

Chapter V (p16) covers disputes, relaxation, removal of difficulties and savings; a Chapter IV is never labelled. The appendices (p17–21) supply the application form, the public-notice format and the licence itself.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Open access, Network planning and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.