Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

Grant of Connectivity to intra-State Transmission System Regulations, 2010 — First Amendment, 2024

Uttar Pradesh Electricity Regulatory Commission (Grant of Connectivity to intra-State Transmission System) (First Amendment) Regulations, 2024

AmendmentDated 7 Feb 2024No. UPERC/Secy/Regulation/04 dated February 7, 2024

Amends a regulation not yet published on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Uttar Pradesh Electricity Regulatory Commission issued this First Amendment to the 2010 intra-State transmission connectivity regulations from Lucknow on 7 February 2024. It applies across Uttar Pradesh and comes into force on publication in the Official Gazette (p9).

The amendment rewrites the applicant categories in Regulation 2.1(b). It creates separate classes for renewable energy generating stations and energy storage systems, including aggregation through a Lead Generator, Lead ESS or Renewable Power Park Developer; smaller RE/ESS connecting through an existing generating station's electrical system; distribution licensees; and captive/open access/data-centre-park applicants at higher voltage and load thresholds (pp9–10). It adds definitions for ESS, Lead ESS, Lead Generator, REGS, renewable hybrid generating station and committed transmission line, while removing non-firm-power concepts (pp10–11).

Regulation 6 now governs applications through lead entities, single-interconnection-point scheduling/metering/DSM, and allocation of responsibility (p11). Regulation 7 covers the connection offer, connectivity bank guarantee, deemed connectivity for distribution licensees under new clause 7.2A, and the connection agreement (pp11–12). Regulation 8 tightens signing and revocation timelines, and new clause 8A provides a detailed return/encashment framework for Conn-BG1 and Conn-BG2 linked to project COD (pp12–14). New clause 10A deals with construction, O&M and ownership transfer of committed transmission lines, with costs recovered through STU transmission charges under the MYT framework (p14). Regulation 11 assigns interface metering responsibility, new clause 12A reduces lead-entity connectivity on revocation of an individual member, and Regulation 16 permits limited transfer of connectivity (pp14–15). The amendment deletes the non-firm-power Schedule and substitutes "renewable" for "non-conventional" in specified provisions (p15).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Energy storage deployment, Open access

Read with this

The regulation itself is not yet published on Voltaic.

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a main regulation not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document