UPERC · Uttar Pradesh Electricity Regulatory Commission
Grant of Connectivity to intra-State Transmission System Regulations, 2010 — First Amendment, 2024
Uttar Pradesh Electricity Regulatory Commission (Grant of Connectivity to intra-State Transmission System) (First Amendment) Regulations, 2024
AmendmentDated 7 Feb 2024No. UPERC/Secy/Regulation/04 dated February 7, 2024
Amends a regulation not yet published on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Uttar Pradesh Electricity Regulatory Commission issued this First Amendment to the 2010 intra-State transmission connectivity regulations from Lucknow on 7 February 2024. It applies across Uttar Pradesh and comes into force on publication in the Official Gazette (p9).
The amendment rewrites the applicant categories in Regulation 2.1(b). It creates separate classes for renewable energy generating stations and energy storage systems, including aggregation through a Lead Generator, Lead ESS or Renewable Power Park Developer; smaller RE/ESS connecting through an existing generating station's electrical system; distribution licensees; and captive/open access/data-centre-park applicants at higher voltage and load thresholds (pp9–10). It adds definitions for ESS, Lead ESS, Lead Generator, REGS, renewable hybrid generating station and committed transmission line, while removing non-firm-power concepts (pp10–11).
Regulation 6 now governs applications through lead entities, single-interconnection-point scheduling/metering/DSM, and allocation of responsibility (p11). Regulation 7 covers the connection offer, connectivity bank guarantee, deemed connectivity for distribution licensees under new clause 7.2A, and the connection agreement (pp11–12). Regulation 8 tightens signing and revocation timelines, and new clause 8A provides a detailed return/encashment framework for Conn-BG1 and Conn-BG2 linked to project COD (pp12–14). New clause 10A deals with construction, O&M and ownership transfer of committed transmission lines, with costs recovered through STU transmission charges under the MYT framework (p14). Regulation 11 assigns interface metering responsibility, new clause 12A reduces lead-entity connectivity on revocation of an individual member, and Regulation 16 permits limited transfer of connectivity (pp14–15). The amendment deletes the non-firm-power Schedule and substitutes "renewable" for "non-conventional" in specified provisions (p15).
Read with this
The regulation itself is not yet published on Voltaic.
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a main regulation not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.