Skip to content

OERC · Odisha Electricity Regulatory Commission

Net Metering/Bi-Directional Metering for Solar PV Projects Order, 2016 (as amended up to 2018)

ON NET METERING/BI-DIRECTIONAL METERING & THEIR CONNECTIVITY WITH RESPECT TO SOLAR PV PROJECTS

OrderDated 19 Aug 2016No. OERC-Engg. 02/2010/(Vol-IV)/1131 dated 19.08.2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Odisha Electricity Regulatory Commission's consolidated order on net metering and bi-directional metering for solar PV projects, issued in August 2016 and printed as amended up to January 2018 (p1). It replaces the Commission's earlier rooftop-solar net metering order of November 2014 and its two amendments, and applies both to prospective net-metered consumers and to existing consumers of the same categories (p13).

The preamble (pp1–3) gives the rationale — Odisha's solar resource, land constraints in cities, falling solar tariffs against rising retail tariffs — and cites the Commission's mandate under s.86(e) of the Electricity Act 2003. It widens the earlier framework: any solar system connected through an electrical service connection qualifies, whether roof-mounted, ground-mounted or on an elevated structure, for captive use, and the earlier single-location capacity restriction is removed.

Sections 2–7 (pp3–5) define net-meter, bi-directional meter, eligible consumer and prosumer, set out the self-owned and third-party-owned ownership models, fix capacity limits by reference to the consumer's sanctioned/contracted load, and describe interconnection arrangements.

Sections 8–12 (pp5–9) cover the process and commercial mechanics: application in the prescribed form with a fee, a standard agreement with the licensee, a prescribed disposal timeline, the cumulative penetration ceiling at distribution-transformer level, deemed RPO treatment for the licensee, metering (a separate solar generation meter plus an import/export meter to BIS/CEA standards, with testing and sealing duties), energy accounting over an annual settlement period ending with the financial year, carry-forward of surplus only within that year, and monthly billing with a reconciliation method for defective meters.

Sections 13–16 (pp9–13) set LT connectivity and technical/interconnection parameters by reference to CEA regulations and IEEE/IS standards, impose operation, maintenance, anti-islanding and anti-back-feeding obligations on the consumer, and confirm that net-metered solar energy is not REC-eligible.

Annexures carry the grid-interactive system diagram (p14), the application form (p15) and the standard net metering agreement (pp16–19).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Metering, Billing and payment

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document