This is the Odisha Electricity Regulatory Commission's consolidated order on net metering and bi-directional metering for solar PV projects, issued in August 2016 and printed as amended up to January 2018 (p1). It replaces the Commission's earlier rooftop-solar net metering order of November 2014 and its two amendments, and applies both to prospective net-metered consumers and to existing consumers of the same categories (p13).
The preamble (pp1–3) gives the rationale — Odisha's solar resource, land constraints in cities, falling solar tariffs against rising retail tariffs — and cites the Commission's mandate under s.86(e) of the Electricity Act 2003. It widens the earlier framework: any solar system connected through an electrical service connection qualifies, whether roof-mounted, ground-mounted or on an elevated structure, for captive use, and the earlier single-location capacity restriction is removed.
Sections 2–7 (pp3–5) define net-meter, bi-directional meter, eligible consumer and prosumer, set out the self-owned and third-party-owned ownership models, fix capacity limits by reference to the consumer's sanctioned/contracted load, and describe interconnection arrangements.
Sections 8–12 (pp5–9) cover the process and commercial mechanics: application in the prescribed form with a fee, a standard agreement with the licensee, a prescribed disposal timeline, the cumulative penetration ceiling at distribution-transformer level, deemed RPO treatment for the licensee, metering (a separate solar generation meter plus an import/export meter to BIS/CEA standards, with testing and sealing duties), energy accounting over an annual settlement period ending with the financial year, carry-forward of surplus only within that year, and monthly billing with a reconciliation method for defective meters.
Sections 13–16 (pp9–13) set LT connectivity and technical/interconnection parameters by reference to CEA regulations and IEEE/IS standards, impose operation, maintenance, anti-islanding and anti-back-feeding obligations on the consumer, and confirm that net-metered solar energy is not REC-eligible.
Annexures carry the grid-interactive system diagram (p14), the application form (p15) and the standard net metering agreement (pp16–19).
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.