Skip to content

BERC · Bihar Electricity Regulatory Commission

Power Regulatory Accounting Regulations, 2018

the Commission (Power Regulatory Accounting) Regulations, 2018

RegulationDated 2 Apr 2018Published in the Gazette 3 Apr 2018BERC/SMP-31/2017-05 dated 2nd April 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software, from pages 1 to 29 of 32. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission issued the Power Regulatory Accounting Regulations, 2018, notified on 2 April 2018 and published in the Bihar Gazette on 3 April 2018; they come into force from Gazette publication (p1). They extend to Bihar and apply to all regulated entities—licensees, deemed licensees and generating companies, including entities that also generate and file for tariff or annual performance review (p1). Chapter I (pp1–4) contains the short title, applicability and definitions: “Regulatory Accounts” are audited accounts containing financial and non-financial information in prescribed formats, over and above statutory accounts; “Entity”, “Licensee”, “Regulated Business” and “Other Business” are defined; undefined terms follow the Electricity Act 2003, with that Act prevailing on inconsistency.

Chapter II (pp4–29) is the operative accounting code. It requires every entity to maintain an accounting manual describing its structure, business segmentation (generation by hydro/thermal/gas/renewable/nuclear, transmission, SLDC, distribution wheeling and retail supply, trading), accounting policies, cost and profit centres, and apportionment studies; the manual and later changes are filed with the Commission (pp4–5). Audited regulatory accounts must be filed annually, along with formats and the manual, and audit reports must cover specified allocation, capitalisation, depreciation, power purchase, subsidy and loan matters (pp5–7). Entities must keep segregated financial, operational and accounting records for regulated and other business, prepare accounts on historical cost and applicable accounting standards, with regulatory treatment prevailing on inconsistency (pp7–8).

Sections 9–41 (pp8–23) prescribe accounting policies: fixed assets, capital work in progress, depreciation, project study expenditure, capitalisation rules, land and buildings, replacements, spares, income from investments, revenue timing, warranty claims, discounts, intangibles, equity, return on equity/capital employed, taxes, O&M, leasehold land, power purchase cost, loans, foreign exchange variation, working capital, security deposit interest, contingency reserve, incentives, deemed generation, truing up, sales, non-tariff income, other business income, prior-period items, regulatory assets and carrying cost, profit sharing, subsidy, banking, cash-basis items, bad debts, inventory, retail/wheeling bifurcation, and regulated rate base.

Section 42 (pp23–26) gives allocation principles for common assets, current assets, liabilities, expenses, replacement of asset parts, interest, return and income tax. Section 43 (pp26–29) requires distribution licensees to segregate ARR into Wires and Retail Supply businesses and provides allocation bases and interim ratios for power purchase, employee, R&M, A&G, depreciation, interest, bad debts, RoE, income tax, non-tariff income and licence fee; ratios may be reviewed. Pages 30–32, likely formats or appendices, are not available.

Primary topics
Cost of supply and cost allocation, Business separation and other business, Capital cost and investment

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document