CSERC · Chhattisgarh State Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff Regulations, 2006

The Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2006

RegulationDated 17 Feb 2006No.12/CSERC/2006 dated 17th February 2006

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CSERC's principal cost-of-service tariff regulation, notified as No.12/CSERC/2006 and signed by the Secretary (p1, p19). It lays down how the Commission will determine generation, transmission and distribution tariffs where tariff is fixed on capital cost, and creates the framework for a multi-year tariff regime. It was made under sections 45, 61 and 62 read with section 181(zd) of the Electricity Act 2003 and extends to the whole of Chhattisgarh from the date of gazette publication, a date the document does not print (p1).

Chapter 1 (pp1–3) gives the short title, commencement, scope and the definitions, including the carve-out that tariffs discovered through Central Government bidding are adopted under section 63 rather than determined (pp1–2). Chapter 2 (p4) covers the annual tariff petition for generating companies and transmission licensees and directs the Commission to CERC's 2004 tariff principles, with room for relaxed norms for older stations, co-generation and renewables.

Chapter 3 (pp4–18) is the substantive bulk and applies to distribution licensees: the annual petition, sales forecasting and monitoring, loss estimation and target-setting with sharing of gains and losses, power purchase requirement on merit order, debt-equity and capital cost rules, additional capitalisation, working capital, and every expense head of the Annual Revenue Requirement — power purchase, O&M, depreciation, advance against depreciation, interest and finance charges, bad debts, contingency reserve, foreign exchange variation and income tax — ending with return on equity and ARR (pp7–14). It then sets tariff-design principles: multi-year tariff with a control period, cost to serve, category rationalisation, two-part and time-of-day tariffs, power factor and load factor rebates, progressive reduction of cross subsidy, wheeling charges on the wire business, a variable cost adjustment formula, bulk supply tariff, treatment of State subsidy under section 65 and performance incentives (pp14–18).

Chapter 4 (pp18–19) carries the transitional provision for the State Electricity Board under section 172, savings for the Commission's inherent powers, and powers to remove difficulties and to amend; the English version prevails over the Hindi. The Appendix (pp20–21) is the depreciation schedule of asset classes with useful life and rates.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), Wheeling and retail supply tariff

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.