Skip to content

NERC · Nagaland Electricity Regulatory Commission

Conduct of Business Regulations, 2010 — First Amendment, 2018

Nagaland Electricity Regulatory Commission (Conduct of business) (First Amendment) Regulations, 2018

AmendmentDated 16 May 2018NERC/REGN/T-15/2017 dated 16 th May,'18

Amends the Conduct of Business Regulation, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page notification by the Nagaland Electricity Regulatory Commission amending the fee schedule attached to its principal Conduct of Business Regulations. Issued at Kohima on 16 May 2018 under s.181 of the Electricity Act 2003 and Regulations 41 & 43 of the NERC (Conduct of Business) Regulations, 2010, it replaces the fee structure in Appendix-4 (Schedule of Fees) of those principal regulations (p1).

The operative content is the revised schedule itself. The extract reproduced here shows the fee for a petition by a distribution licensee (including a deemed licensee) for determination of retail, wholesale or bulk supply tariff, and a capacity-slab fee for petitions for determination of tariff for renewable / non-conventional generating stations — above 2 to 5 MW at `.4,00,000/-, and above 5 MW to 25 MW at `.5,00,000/- plus `.20,000/- for each additional MW or part thereof above 5 MW (p1). The retail-tariff petition fee is stated as `.3,00,000/- (p1).

Page 2 carries only the endorsement copy list — Chief Secretary, Power Department, New & Renewable Energy Department, Engineer-in-Chief, Chief Electrical Inspector — and the Secretary's signature; no commencement date, Gazette date or savings clause is stated anywhere in the text (p1–2).

Standard name
Conduct of Business Regulations
Primary topics
Fees payable to the Commission

Read with this

The regulation

Amendments and corrections

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document