Summary
Summary written by software. Check the regulator's original before you rely on it.
The Arunachal Pradesh State Electricity Regulatory Commission published this draft regulation to replace its 2012 RE tariff framework (p5, p24). The notification states that the draft is issued under the Electricity Act, 2003, s.61 read with s.181(2)(zd) and s.86(1)(a), and invites objections or suggestions within thirty (30) days of Gazette publication, with comments due by 21th March 2018 (p5). It would come into force sixty days after Gazette publication, but the Gazette date is not printed (p5).
Chapters 1–2 set the common framework. Chapter 1 (pp10–13) creates a three-year control period starting with FY 2018-19, ties the tariff period to the project's useful life from commercial operation, lists technologies for which only project-specific tariff will be determined, prescribes the petition and filing route, sets a single-part fixed-cost tariff (two-part for MSW/RDF), establishes levellised tariff design, and treats all RE plants as must-run. Chapter 2 (pp14–17) lays down financial principles: capital cost, debt-equity, loan and finance charges, depreciation, return on equity, working capital, CUF/PLF hours, O&M escalation, rebate, late-payment surcharge, CDM benefit sharing, subsidy treatment and taxes/duties.
Technology chapters then specify norms. Small hydro (pp18–19) covers capital cost, indexation, CUF net of free power, auxiliary consumption and O&M. Wind (pp19–20) leaves capital cost and O&M to project-specific determination and grades CUF by wind power density. Solar PV (pp20–21) covers technology scope, project-specific capital cost/O&M, CUF and auxiliary consumption. MSW/RDF projects using Rankine cycle (pp21–22) have project-specific capital cost, PLF and stabilisation, auxiliary consumption, station heat rate, O&M, calorific value and fuel-cost escalation.
Chapter 7 (pp23–24) allows tariff deviation only if the levellised tariff does not exceed the regulated levellised tariff, gives overriding effect to competent-authority guidelines, grants powers to relax, remove difficulties and amend, and repeals the 2012 RE regulations. Annexures (pp25–29) contain the petition forms and tariff-computation templates.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 28 Feb 2018Public notice: Draft RE Tariff Determination Regulations, 2017 — Public Notice, 2018
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.