Delhi Electricity Regulatory Commission (Terms & Conditions for Determination of Tariff for Grid-connected Solar Photo Voltaic Project) Regulations, 2013
RegulationDated 8 Jan 2013No. F. 11(764)/DERC/2011-12/3271/5061 dated 8 January, 2013
Summary
Summary written by software. Check the regulator's original before you rely on it.
This notification publishes the DERC regulations that govern how the Commission determines tariff for grid-connected solar PV projects in Delhi. It was issued in New Delhi on 8 January 2013 under the Electricity Act 2003 tariff and renewable-energy provisions, extends to the whole of NCT of Delhi, and comes into force on the date of its publication in the Delhi Gazette — which the text does not print (p13). Any statement of reasons or earlier pages are not included here.
Regulations 1–4 are preliminary: title, extent, commencement, definitions, scope and eligibility. The regulations apply to grid-connected solar PV projects whose tariff the Commission determines under Section 62 read with Section 86, subject to an eligibility threshold — projects of capacity equal to or more than 25kWp based on MNRE-approved PV technologies (p14).
Chapter 1 (Regulations 5–12) sets general principles: a three-year control period starting with FY 2012-13, with tariffs continuing for the full tariff period even if the next control period's regulations are delayed; a petition-based, project-specific tariff with a prescribed information pack; a 25-year tariff period and useful life; a single-part tariff built from five cost components; levelised tariff design using post-tax WACC; and must-run dispatch status (p15–16).
Chapter 2 (Regulations 13–22) is the financial and technical normative core — capital cost definition and its reviewable ceiling, debt-equity treatment, loan tenure and a formula-driven interest rate, the depreciation approach and salvage treatment, a two-stage return on equity, working capital composition and interest, O&M expenses with escalation, technology and connection-level rules by project size, plant life, and CUF (p16–18).
Chapter 3 (Regulations 23–26) covers metering, billing and payment: metering under CEA and DERC metering/grid/supply instruments, the solar meter and joint reading responsibility split between licensee, developer and SLDC, monthly billing, a payment deadline, late payment surcharge and rebates (p18–19).
Chapter 4 (Regulations 27–37) is miscellaneous: subsidy and incentive treatment including accelerated depreciation, taxes and duties as pass-through, CDM benefit sharing, grid augmentation cost, a connectivity application procedure with timelines and a no-compensation clause, meter communication/data-storage requirements, power quality per CEA standards, and the Commission's powers to remove difficulties, relax, interpret and amend (p19–21).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.