MPERC · Madhya Pradesh Electricity Regulatory Commission

Levy and Collection of Fee and Charges by SLDC Regulations, 2006 — Third Amendment, 2010

Madhya Pradesh Electricity Regulatory Commission (Levy and Collection of Fee and charges by State Load Despatch Centre) (Revision-I) Regulations, 2006 (Third Amendment) {ARG - 16 (iii) of 2010}.

AmendmentDated 30 Oct 2010Published in the Gazette 19 Nov 2010No. 2955/MPERC-2010 dated 30th October, 2010

Amends the Levy and Collection of Fee and Charges by SLDC Regulations, 2004 — Revision 1, 2006.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This one-page Gazette notification is the Third Amendment to MPERC's 2006 regulations on fees and charges levied by the State Load Despatch Centre (p1). It substitutes clause 9.9(ii) so that interest on working capital is computed on a normative basis at the applicable State Bank Base Rate as on 1st April of that year plus 4.00% (p1). The change follows RBI guidelines replacing the Prime Lending Rate system with the Base Rate system (p1). It applies to licensees and open access customers using the intra-State transmission system and state sector generating stations monitored and serviced by SLDC in Madhya Pradesh (p1). The amendment comes into force on publication in the MP Official Gazette; the order is dated 30 October 2010 and the Gazette notification 19 November 2010 (p1).

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Return, financing and working capital

Read with this

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document