MERC · Maharashtra Electricity Regulatory Commission
Specific Conditions of Distribution Licence (Reliance Energy Limited) Regulations, 2008
Maharashtra Electricity Regulatory Commission (Specific conditions of Distribution Licence applicable to Reliance Energy Limited) Regulations, 2008
RegulationDated 20 Aug 2008MERC/TEC/ Licence Conditions/REL/2008/1665 dated 20th August, 2008
Summary
Summary written by software. Check the regulator's original before you rely on it.
This two-page MERC regulation fixes the licence-specific conditions for Reliance Energy Limited's distribution and retail supply business, to be read together with the Commission's general licence conditions. Regulation 1 gives the short title, supersedes the previous licence, clearance or approval held by REL under the laws repealed by the Electricity Act, extends the regulations to REL's whole Area of Supply, and ties commencement to publication in the Official Gazette (p1). Regulation 2 defines the Act, REL/the Distribution Licensee — noting the company's change of name to Reliance Infrastructure Limited — and the General Conditions, i.e. the 2006 General Conditions of Distribution Licence Regulations (p1). Regulation 3 makes the Specific Conditions plus the General Conditions the deemed conditions of REL's licence (p1–2). Regulation 4 sets the Area of Supply by reference to the Bombay Suburban Electric License, 1926 and authorises supply to the public for all purposes (p2). Regulation 5 caps the licence term at 15 August 2011, the remainder of REL's deemed-licensee period (p2). Regulation 6 requires public inspection of the conditions and licence from notification (p2). Regulations 7 and 8 give the Commission power to amend and to remove difficulties by order (p2). It is signed by the Secretary and dated Mumbai, 20 August 2008.
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.