Skip to content

GERC · Gujarat Electricity Regulatory Commission

Guidelines for Procurement of Power by Distribution Licensees, 2013

Guidelines for Procurement of Power by Distribution Licensees

GuidelinesDated 7 Aug 2013Notification No. 2 of 2013

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's notification setting out the procedure every distribution licensee in Gujarat must follow when buying power. It is framed under s.86(1)(b) of the Electricity Act 2003, with the preamble (p1) reciting that the Commission's job is to regulate electricity purchase and procurement, and that power purchase cost is the largest element of a licensee's aggregate revenue requirement.

The operative part is 17 numbered clauses (pp2–7). Clauses 3–5 (pp2–3) impose planning discipline: an annual five-year procurement plan due by 31 January, ten-year peak-load and energy forecasts, five-year hourly load-duration projections, and a requirement to have long-term or medium-term tie-ups covering at least 75% of load duration in the fifth year and 85% in the third year, with long-term or medium-term procurement to be initiated on any shortfall.

Clauses 6–12 (pp3–5) cover long-term and medium-term buying: competitive bidding is the norm; MoU-route purchases need prior GERC approval; bidding must follow the Ministry of Power's long-term bidding guidelines of 19/01/2005 and short-term guidelines of 15/05/2012, with GERC approval required for deviations and for certain pre-bid aspects. Clause 10 (p4) sets out the PPA approval process — newspaper notice, public objections to the Secretary within 30 days, and a GERC order within 90 days of registration of a complete application. Renewable procurement is to follow a Model PPA to be prescribed separately by GERC (clause 11, p4).

Clauses 13–16 (pp5–6) deal with short-term procurement via power exchanges or open tendering, a single-stage RFP, the Standing Committee's conformity certificate, and deemed adoption of tariff where it falls within the ARR approval, otherwise a petition to GERC. Clause 17 (pp6–7) lets GERC waive competitive process in unforeseen and exceptional situations, but the licensee must still justify the departure economically. The notification is dated 7 August 2013 (p7).

Standard name
Power Procurement Regulations
Primary topics
Power procurement and PPAs, Competitive bidding, Resource adequacy

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document