Skip to content

CERC · Central Electricity Regulatory Commission

Transmission and Communication System Tariff Filing Forms, 2019 — Part III, Annexure-I

TARIFF FILING FORMS (TRANSMISSION& COMMUNICATION SYSTEM) FOR DETERMINATION OF TARIFF

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is Part-III of Annexure-I to CERC's tariff-filing framework: a complete set of forms, tables and notes that a transmission licensee or communication-system licensee must use when filing a transmission tariff petition for the 2019-24 control period. The cover page calls it 'Tariff Filing Forms (Transmission & Communication System) for Determination of Tariff – Part-III, Annexure-I' (p1). It is not a substantive tariff regulation; it is the procedural annexure that tells the petitioner what to file, in what format, and how each figure is to be built up.

The first pages are a checklist: an index of forms (Form-1 to Form-15, plus Form A) and a list of supporting documents, including loan agreements, BPTA/TSA/PPA, DPR, CPM/PERT charts and cost/time-overrun justification (pp2–4). The checklist also requires an electronic copy in Word and detailed calculations in Excel, uploaded to the e-filing website and supplied on pen drive (p4). Form-1 summarises the claimed tariff (depreciation, interest on loan, return on equity, interest on working capital and O&M) over the five-year period (p5); Form-1A and the following pages break that down asset-wise, with separate sections for transmission lines, substations and communication systems and an O&M expense claim split into normative O&M and Regulation 35(3)(c) items such as security expenses and capital spares (pp6–10). Form-3 captures the normative parameters used in the computation (p11).

For existing projects commissioned before 01.04.2019, the forms prescribe a methodology to determine an effective COD and a weighted average useful life so that a single AFC can be determined for the project as a whole (pp12–14). The capital-cost forms then run through the statement of capital cost and CWIP (pp15–17), a new-project estimate and commissioning schedule (pp18–19), and an element-wise break-up of project cost with detailed lines for transmission line, substation, communication system, overheads, IDC, FERV and initial spares (pp20–28). Form-5A breaks out construction/supply/service packages (p29), Form-5B lists all assets in the project (p30), Form-6 gives actual cash expenditure and the financial package up to COD (p31), and Forms 7/7A cover additional capitalisation after COD and its financing (pp32–35).

The financing and returns block includes Form-8/8A for return on equity at the normal rate and at the weighted average rate of actual loans, plus foreign equity (pp36–39); the Form-9 series captures allocated corporate loans, project-specific loans, foreign loans, weighted average interest and interest on normative loan (pp40–48). Depreciation is covered by Form-10, 10A and 10B — rate on original cost, annual depreciation statement and de-capitalisation (pp49–52). Form-11 computes interest on working capital (p53). Form-12/12A/12B deal with time overrun, incidental expenditure during construction, and IDC and financing charges (pp54–59). Form-13 handles initial spares entitlement and excess capitalisation (pp60–61); Form-14 captures non-tariff income (p62); Form-15 summarises the issues in the petition (p63); and Form A summarises capital cost and AFC claimed for all assets (p64).

The forms repeatedly cross-refer to the CERC Tariff Regulations, 2019 — regulations 18(3), 23, 24, 25, 26, 27(4), 30(2), 31 and 35(3)(c) — and to the CERC depreciation schedule (pp32–33, p38, p49). They are written for the 2019-24 tariff period and for true-up petitions, with actuals to be provided at true-up where estimates are allowed at filing (pp10, 11, 62).

Standard name
Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.