Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Draft State Electricity Grid Code Regulations, 2022

West Bengal Electricity Regulatory Commission (State Electricity Grid Code) Regulations, 2022

Draft regulationDated 29 Jun 2022

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is WBERC's consultation package for a draft State Electricity Grid Code for West Bengal. The first three pages are the public-notice trail: the 28 June 2022 notice invites comments on the draft by 20 August 2022 (p3); a 30 June 2022 corrigendum changes that date to 20 July 2022 (p2); and a 22 July 2022 notice extends the last date to 31 August 2022, 3 PM (p1). Pages 4–7 are abbreviation and acronym lists used throughout the code.

The draft regulation proper begins at p8. Chapter 1 gives the short title (WBEGC/State Grid Code), extends it to the whole State and makes it commence on gazette publication, superseding the 2007 State Grid Code and all amendments (p8). It then defines a large set of grid, open-access, ancillary-service, RE and metering terms (pp8–24). Chapter 2 states the objective — joint planning, development, maintenance and operation of the State power system in an efficient, reliable, economic and secure manner while facilitating competition — and sets scope, non-compliance reporting, links to the CERC Grid Code, DSM Regulations and Balancing and Settlement Code, ten alignment parameters, exemptions and interpretation rules (pp25–27). Chapter 3 allocates functions to SLDC, ALDC and STU, including system operation, scheduling, ancillary reserves, open access, restoration and data (pp28–30).

Later pages contain a part-load compensation mechanism for SSGS, with definitions and formulas for heat-rate and auxiliary-consumption degradation and secondary fuel oil (pp158–165); Annexure 5, a detailed operating procedure for committing and de-committing coal/lignite/gas units through SCUC/SCED and reserve shutdown (pp166–169); and Annexure 6, a procedure for forecasting, scheduling and imbalance handling for intra-state RE generators through QCAs or lead generators (pp170–174). Appendices I–IV prescribe data, forecast, telemetry and scheduling-case formats (pp175–182).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Ancillary services and reserves

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document