Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Approval of Hydro Electric Projects in Himachal Pradesh Directions, 2005

Himachal Pradesh Electricity Regulatory Commission (Approval of Hydro Electric Projects in the State of Himachal Pradesh) Directions, 2005

OrderDated 6 Apr 2005HPERC/422/2005 dated 6th April, 2005

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are the Himachal Pradesh Electricity Regulatory Commission's directions, issued 6 April 2005 under Regulation 7(3) of its 2004 Tariff Regulations, requiring prior Commission approval before construction of new hydro electric projects in the state (p1). They apply to projects undertaken by the Board, the state government, generating companies and IPPs that intend to sell power to the Board for use in its area, but not to projects needing CEA concurrence, projects with bilaterally determined tariff where the PPA is already approved, or projects awarded through central-government-guided competitive bidding (p1).

A petitioner must file before construction, with the prescribed fee, following the Conduct of Business Regulation 2005, using Form-I and a Form-II affidavit, and attaching an approved Detailed Project Report plus consents, PPA, evacuation arrangement, financial package, environmental and R&R safeguards, monitoring mechanism and resource-plan certificate (p1–2). Direction 5 requires DPRs to rest on authenticated survey, hydrological, geological, seismological and environmental data; Direction 6 requires the Commission to decide within one month and allows approval with modifications; Direction 7 caps completed cost at approved cost except for stated escalation heads, and Direction 8 requires revised approval for cost overruns beyond specified limits and mandates a fresh petition if the approved cost is exceeded by 3% (p2–3).

Direction 9 makes the petitioner keep records under section 128 of the Act; Direction 10 ties a later section 62/64 generation-tariff application to the project approval; Direction 11 preserves the Commission's inherent powers without limiting them (p3). Form-I at pages 4–5 collects the technical, hydrological, civil-works, cost and financial detail, including tariff calculation over a 40-year project life; Form-II at pages 5–6 is the verifying affidavit (p4–6).

Standard name
Tariff Regulations
Primary topics
Generation tariff, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document