KERC · Karnataka Electricity Regulatory Commission
Framework for Demand Flexibility (DF)/Demand Side Management (DSM) Regulations, 2026
Karnataka Electricity Regulatory Commission (Framework for Demand Flexibility (DF)/Demand Side Management (DSM)) Regulations, 2026.
RegulationDated 10 Mar 2026KERC/DF/DSM/2025-26/1719 dated 10.03.2026
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is KERC's new framework regulation that puts demand flexibility (DF) and demand side management (DSM) on a standing footing for Karnataka's distribution licensees, replacing the Commission's 2015 DSM regulations. The preamble and Order (pp1–2) explain the rationale: the Commission's Framework for Resource Adequacy Regulations, 2024 already compel licensees to build energy efficiency and conservation into resource planning, and DF is presented as the data-driven, market-responsive extension of that duty. The draft 2025 regulations were consulted on, with a public hearing on 19.12.2025, and the final regulations were notified on 10.03.2026 (p1–2).
Chapter I (pp6–10) is the implementation chapter. Every distribution licensee must assess, plan, design and run measurable DF/DSM programmes as part of day-to-day operations, set up a dedicated DF/DSM Cell, and report progress to the Commission. Costs are to be recovered through the Capital Investment Plan in MYT filings, with the current MYT period (FY2025-26 to FY2027-28) served by reappropriating approved capex. The chapter prescribes what the DF/DSM portfolio must contain, when the portfolio plan and annual status report are filed (with MYT and APR submissions), a multi-year Demand Flexibility Portfolio Obligation trajectory expressed as a share of peak demand, a symmetric incentive/disincentive per MW of over- or under-achievement, the menu of eligible programme types, and mandatory public disclosure of load research and evaluation documents on licensee websites.
Chapter II (pp10–14) sets the cost-effectiveness screening: a Total Resource Cost test as the main hurdle, then a Ratepayer Impact Measure test, with formulas, cost and benefit elements, discounting at WACC and default input values the Commission may revise annually. Participant and Societal Cost Tests must also be reported but do not drive decisions (methods in Annexure 2, pp25–27).
Chapter III (pp14–17) sets the Evaluation, Measurement and Verification regime — impact, process and market-effects evaluations; measurement-and-verification, deemed-savings and large-scale data-analysis approaches; empanelment and independence criteria for Independent Verification Agencies; and minimum EMV report contents. Chapter IV (pp17–18) carries the boilerplate powers (removal of difficulties, orders and practice directions, amendment, interpretation, relaxation) and repeals the 2015 DSM Regulations with a savings clause. Annexure 1 (pp19–24) is the DPR and APR reporting format licensees must fill.
Read with this
No other documents to read with it are on Voltaic.
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.