UPERC · Uttar Pradesh Electricity Regulatory Commission
SLDC Fees and Charges Regulations, 2020
Uttar Pradesh Electricity Regulatory Commission (Fees & Charges of State Load Despatch Centre and other related matters) Regulations, 2020
RegulationDated 14 May 2020UPERC/Secy/SLDC Regulation/2020-043 dated May 14, 2020
Replaced by a later regulation not yet published on Voltaic
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a UPERC principal regulation issued at Lucknow on 14 May 2020, made under sections 32 and 33 read with section 181 of the Electricity Act, 2003, to determine the fees and charges the Uttar Pradesh State Load Despatch Centre (SLDC) collects from its users. It applies across Uttar Pradesh for the period 1 April 2021 to 31 March 2025, unless reviewed earlier or extended, and comes into force on publication in the Official Gazette; the Gazette date is not printed (p14).
Chapter 1 gives the short title, extent, applicability and commencement, and defines key terms such as Annual LDC Charges, User, Control Period, Fees, Charges, Buyer and the open-access categories. It also says the English version prevails if it differs from the Hindi version (p14–17). Chapter 2 states that the SLDC is the state load despatch centre and lists its functions — scheduling and despatch, grid monitoring, energy accounting, supervision and control of intra-state transmission, and real-time grid operation (p17).
Chapter 3 is the core. It lays down the procedure and filing calendar for Business Plan, ARR, APR, True-Up and tariff petitions; technical validation and public consultation; components and recovery of Annual LDC Charges; methodology for capital cost, debt-equity, O&M expenses, employee/R&M/A&G escalation, depreciation, interest on loan and working capital, return on equity, income tax and non-tariff income; and the fee/charge structure for registration, short-term open access applications, operating charges and monthly LDC charges (p17–25). Transitional provisos say Annexure-I rates apply until the first tariff order, and until SLDC accounts are segregated from transmission business, SLDC expense and revenue remain under the MYT Regulations (p18).
Chapter 4 covers billing and payment, rebate, late payment surcharge, accounting records, dispute resolution, removal of difficulties, amendment power and repeal/savings of the 2004 SLDC fee regulations (p25). Annexure I lists operating charges; Annexure II gives the SLDC asset depreciation schedule (p26–27).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.