Skip to content

HERC · Haryana Electricity Regulatory Commission

Engagement of Consultants Regulations, 2007

The Haryana Electricity Regulatory Commission (Engagement of Consultants) Regulations, 2007

RegulationDated 11 Oct 2007HERC / 14 / 2007 dated 11th October, 2007

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Haryana Electricity Regulatory Commission's own procurement rulebook for hiring outside consultants. Made under s.91(4) read with s.181 of the Electricity Act 2003, it was issued on 11 October 2007 as Regulation No. HERC/14/2007 and takes effect from the Gazette publication date, which is not printed in the text (p1).

The operative regulations (pp1–7) run from short title and definitions through to amendment power. Regulation 3 says consultants may be hired only for specialised, time-bound tasks where in-house skills are absent, on Commission-approved Terms of Reference, with proposals advertised in at least two national newspapers plus the Commission's website (p2). Regulation 4 sets a lighter route for individual consultants — one newspaper plus website — selected on qualifications (p2). Regulation 5 specifies what a TOR must contain; Regulation 6 caps any engagement at two years with half-yearly performance review (p3).

Regulation 7 is the evaluation core: a Commission-nominated technical committee scores each criterion 1–100, applies weights within prescribed ranges, and requires a minimum technical score of 70 (Seventy) to qualify (p3–4), with technical negotiations permitted between opening technical and financial bids. Regulation 8 governs fees, negotiating committee, rejection of unresponsive or overpriced proposals, tax deduction at source and the all-inclusive nature of the amount (p4). Regulations 9–14 cover conflict of interest, obligations and liability, force majeure, confidentiality, IP ownership, duty of care, performance standards and termination (pp4–6). Regulation 15 refers disputes to arbitration by a Commission nominee under the Arbitration and Conciliation Act 1996 (p7); Regulations 16–18 preserve the Commission's power to remove difficulties, depart from its own procedure, and amend the regulations (p7).

Annexure-I (pp8–11) is a fill-in-the-blank model contract for firm consultants, with five schedules (A–E) covering scope of work, personnel, services and deliverables, staff training, and payment. Annexure-II (pp12–14) is a parallel, shorter model contract for individual consultants. Notably, Annexure-II omits a Schedule-B personnel schedule and cross-refers to 'HERC Engagement of Consultants Regulations, 2006' rather than 2007 (pp10, 14).

Standard name
Appointment of Consultants

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document