Skip to content

WBERC · West Bengal Electricity Regulatory Commission

West Bengal Works of Licensees Rules, 2006

the West Bengal Works of Licensees Rules, 2006

RulesDated 8 Sep 2006Published in the Gazette 18 Oct 2006No. 311-PO/O/III/3R-15/2005 dated the 8th September, 2006

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are state rules made by the West Bengal Government under the Electricity Act 2003 to regulate how electricity licensees may carry out works — laying supply lines, fixing supports, opening streets and working near other utilities. The notification is dated 8 September 2006 (p1) and the rules commence on publication in the Official Gazette, printed here as 18 October 2006 (p1–2). The text runs to 16 rules across pp2–11.

Rules 1–2 give the short title, commencement and definitions, mainly importing definitions from the Act (p2). Rule 3 sets the basic consent regime: a licensee may place works in, over or under buildings or land with the prior consent of the owner or occupier; if objections are raised, permission must be obtained from the District Magistrate, Commissioner of Police or authorized officer, who also fixes compensation or annual rent, with orders revisable by the West Bengal Electricity Regulatory Commission (WBERC). Existing section 164 powers are preserved (p2–3).

Rule 4 covers works affecting streets, railways, tramways, canals or waterways: notice with plans, approval or disapproval by repairing and works authorities, deemed approval, appeals and requisitions to WBERC, and shorter notice categories for certain underground service lines and repair or renewal works (p3–5). Rule 5 allows an emergency overhead line after informing the relevant authority, subject to a limited duration and removal once the defect is cured (p5). Rule 6 governs digging near sewers, pipes and other electric lines: notice, presence of the owner, support, safety compliance under section 53, compensation for default, WBERC dispute resolution, and an exception where the licensee is a local authority (p5–6). Rule 7 deals with altering the position of pipes or electric lines, including notice requirements, WBERC determination, and the owner's right to do the alteration himself with security (p7–8).

Rules 8–14 address street openings not repairable by government or a local authority, fencing, lighting and reinstatement duties, avoidance of nuisance and environmental damage, deposit of restoration amounts, restoration and maintenance, compensation determination, and deposit or security formalities through demand draft and bank guarantee (p9–11). Rule 15 requires WBERC to decide disputes within a fixed period after hearing; Rule 16 applies section 171 service-of-notice procedure (p11).

Standard name
Works of Licensees Rules
Primary topics
Electrical safety

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document