JSERC · Jharkhand State Electricity Regulatory Commission
Framework for Sharing of Charges for Intra-State Transmission System, 2019
Jharkhand State Electricity Regulatory Commission (Framework for sharing of charges for Intra-State Transmission System) Regulations, 2019
RegulationDated 4 Oct 2019Published in the Gazette 10 Oct 201971 dated 4th October, 2019
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is JSERC's framework regulation for how the annual charges of the intra-state transmission system (InSTS) are shared among its users. It was notified on 4 October 2019 (p1) and published in the Jharkhand Gazette Extraordinary on 10 October 2019, which under clause 2.2 is also its commencement date (p1–2).
Chapter I gives the rationale and the machinery. The preamble explains that existing InSTS investment is handled under sections 61 and 62 of the Electricity Act 2003, but future projects may be awarded through tariff-based competitive bidding under section 63, with a developer other than the existing State Transmission Utility — hence the need for a sharing framework covering both routes (p1–2). Clause 2.4 extends the regulation to the STU, SLDC, distribution and transmission licensees, generating companies including captive stations and open access consumers connected or planning to connect to the InSTS, for existing projects and for those to be developed under sections 62 and 63 (p2). Clause 3.1 defines the vocabulary the charging formulae turn on — allotted transmission capacity, annual transmission charges (ATC), total transmission capacity, and long/medium/short-term transmission customers distinguished by the length of their lien (p2–3).
Chapter II is the operative core. Clause 4.2 states that with this notification the framework here applies to all existing and new InSTS, replacing the one previously given in the JSERC (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2015 (p4). Clauses 5.1–5.7 cover section 62 systems: the licensee files an ARR petition under the 2015 tariff regulations, ATC is derived from the approved ARR, monthly charges are shared pro rata to allotted capacity for long and medium term customers, dedicated systems are paid for by the beneficiary customer under the TSA, short-term charges are levied per day, and the STU retains part of short-term collections with the balance credited back to long and medium term customers (p4). Clauses 6.1–6.11 mirror this for section 63 projects, with a different treatment of short-term collections, each competitively bid network treated as a standalone cost pool, and extension to SPV/subsidiary projects (p5).
Chapter III makes the STU the nodal agency for capacity allocation, billing, collection and disbursement, with monthly accounts built from the yearly ATC and each user's allotted share (p5–6). Chapter IV covers dispute resolution, the Commission's powers to amend and to remove difficulties by order, and savings preserving the Commission's inherent powers (p6). Note that clause A11 is headed 'Repeal and Savings' but contains no repeal; the only supersession is the operative statement in clause 4.2 (p4, p6).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.