Furnishing of Technical Details by the Generating Companies Regulations, 2009

Central Electricity Regulatory Commission (Furnishing of Technical Details by the Generating Companies) Regulations, 2009

RegulationDated 14 Oct 2009Published in the Gazette 23 Oct 2009F. No. L-7/138/(153)/2008-CERC dated New Delhi, the 14th October, 2009

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short CERC regulation, published in the Gazette of India (Extraordinary, Part III—Section 4, No. 198) on 23 October 2009 and dated 14 October 2009, whose real content sits in three appended reporting forms (p1, p10).

Regulation 1 supplies the short title and makes commencement turn on publication in the Official Gazette (p10). Regulation 2 is the operative duty: every generating company which, at commencement, is operating or setting up a station referred to in clause (a) or (b) of Section 79(1) of the Electricity Act 2003 must send the Commission up-to-date technical details in the applicable form, filed separately for each stage of the station, showing status as on 1 April and submitted by 30 April every year, with a soft copy (p11). A company proposing a new station must file its first report at least three years before the projected commercial operation date of the first unit (p11).

Form A covers coal/lignite-fired thermal stations — unit configuration and commercial operation dates, beneficiaries and merchant capacity, equipment manufacturers, fuel source and transport, fuel quality, steam parameters, guaranteed turbine cycle heat rate with its reference conditions, boiler efficiency and cooling arrangements (pp11–13). Form B covers gas/liquid/diesel stations — GT/ST block configuration, HRSG and generator manufacturers, fuel and alternate fuel, gas-turbine inlet parameters, guaranteed gross station heat rate in combined and open cycle modes, reference conditions and site ambient conditions (pp14–15). Form C covers hydro stations — run-of-river or pondage type, design energy, average and rated head, reservoir levels, silt limits, expected annual generation and guaranteed turbine efficiency (pp15–16). Each form closes with notes that import defined terms and require an electronic copy (p13, p15, p16).

Standard name
Compliance Audit and Furnishing of Information
Primary topics
Compliance and reporting

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document