BERC · Bihar Electricity Regulatory Commission
Draft Multi Year Transmission Tariff and SLDC Charges Regulations, 2024
Bihar Electricity Regulatory Commission (Multi Year Transmission Tariff and SLDC Charges) Regulations, 2024
Public notice on a draftDated 23 Jul 2024
Draft
The draft has since been finalised as the Multi Year Transmission Tariff and SLDC Charges Regulations, 2024.
Public notice on a draft that is not on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Draft Bihar Electricity Regulatory Commission (Multi Year Transmission Tariff and SLDC Charges) Regulations, 2024 is BERC's proposed multi-year framework for determining intra-state transmission tariff and SLDC fees and charges in Bihar (p1). It is framed under section 181(1) and clauses (zd), (ze) and (zf) of section 181(2), read with sections 32, 61, 62 and 86 of the Electricity Act, 2003. It extends to the whole of Bihar and comes into force on Gazette notification (date not printed); tariff determination under it applies from 1 April 2025 to 31 March 2028, or until amended (pp1–2). It binds transmission licensees and the SLDC, applies where the Commission determines cost-based/ARR-based tariff, and is expressly excluded where tariff has been discovered through tariff-based competitive bidding adopted under section 63 (pp1–2).
Part I (pp1–13) sets title, commencement, extent and scope, and defines the accounting, availability, capitalisation, transmission-capacity and change-in-law vocabulary the rest of the instrument uses.
Part II (pp13–19) sets the general principles: the multi-year tariff framework and its elements, the Business Plan requirement and its contents, the Commission's power to stipulate trajectories for variables such as capitalisation schedule, O&M norms, availability and losses, annual review and true-up, and the split between controllable and uncontrollable factors with separate sharing mechanisms for gains and losses on each.
Part III (pp19–26) is the procedure: filing and admission of the Business Plan and tariff applications, formats and fees, publication of public notices and receipt of objections, the Commission's timelines for disposing of applications, the tariff order, True-up and Annual Performance Review, and the consequence of recovering above the approved tariff.
Part IV (pp26–29) sets operating norms: treatment of auxiliary energy consumption at substations, the Normative Annual Transmission System Availability Factor with its incentive formula, quality-of-supply parameters to be monitored, safety standards, and the rules for admitting additional capitalisation before and after the cut-off date, including ceilings for capitalising initial spares by asset type.
Part V (pp29–48) contains the financial principles: financial prudence tests, ARR components, the O&M framework with employee, R&M and A&G formulas, return on equity, depreciation, interest and finance charges on loan capital, IDC and IEDC, interest on working capital, tax gross-up on return on equity, contingency reserve, bad and doubtful debts, non-tariff income, income from other business, annual transmission charges, sharing of transmission and SLDC charges, short-term and collective transaction tariffs, separation of transmission and SLDC functions, incentive/disincentive, rebate and late payment surcharge.
Part VI (pp48–49) covers power to amend, power to remove difficulties, limitation of the Commission's power, and repeal and savings: the 2021 MYT Transmission Tariff and SLDC Charges Regulations are repealed, but pre-control-period proceedings continue under the earlier regulations.
Appendices and annexures follow: the SLDC availability certificate format (p50), the availability computation methodology with element weightages (pp51–55), the project completion time schedule (p56), surge impedance loading figures for AC lines (p57), the index of filing formats (p58) and the S, F and P series formats for ARR, tariff and performance filings (pp59–115).
Read with this
The regulation
- Dated 30 Oct 2024Multi Year Transmission Tariff and SLDC Charges Regulations, 2024
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.