This is MPERC's first amendment to its 2021 Supply and Wheeling Tariff Regulations, issued as No. 599/MPERC 2023 and numbered ARG-35(III)(i) of 2023 (p1). It extends to the whole of Madhya Pradesh and, by its own terms, stays in force from the date of notification until 31st March 2027 — the notification date is not printed anywhere in the document (p1).
The amendment does three things. It first inserts a definition of the Fuel and Power Purchase Adjustment Surcharge (FPPAS) into the Principal Regulations' definition clause as (ze)(A), framing it as the increase in the cost of power supplied to consumers caused by changes in fuel and power purchase cost measured against the Commission-approved cost of supply (p1).
Its bulk is a wholesale substitution of Regulation 9 (pp1–5), which converts FPPAS from a Commission-approved levy into an automatic, formula-driven monthly pass-through. The new Regulation 9 sets out the principle, the monthly billing cycle and the (n+2)th-month computation basis, a two-month cap on carry-forward to avoid tariff shock, carrying cost on carried-forward amounts, a graduated recovery rule where FPPAS crosses 5% of energy charge, annual true-up and the treatment of over- and under-recovery, reporting and website-publication duties, and a unified billing-system requirement for the licensee. Regulation 9.13 supplies the FPPAS formula with its variables, and 9.14–9.16 carve out deviation settlement, ancillary services/SCED and supplementary bills from the power purchase cost.
Finally, Regulation 47 is substituted (p5) so that an open access consumer inside a distribution licensee's supply area pays Cross-Subsidy Surcharge as determined by the Commission, subject to the statutory cap of twenty per cent of Average Cost of Supply.
Read with this
Voltaic does not hold the regulation itself.
No other documents to read with it are on Voltaic.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.