Supply and Wheeling Tariff Regulations, 2021 — 1st Amendment, 2023

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of Charges) (1st Amendment) Regulations, 2021{ARG-35(III)(i) of 2023}

AmendmentDated 17 Mar 2023No. 599 / MPERC 2023

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MPERC's first amendment to its 2021 Supply and Wheeling Tariff Regulations, issued as No. 599/MPERC 2023 and numbered ARG-35(III)(i) of 2023 (p1). It extends to the whole of Madhya Pradesh and, by its own terms, stays in force from the date of notification until 31st March 2027 — the notification date is not printed anywhere in the document (p1).

The amendment does three things. It first inserts a definition of the Fuel and Power Purchase Adjustment Surcharge (FPPAS) into the Principal Regulations' definition clause as (ze)(A), framing it as the increase in the cost of power supplied to consumers caused by changes in fuel and power purchase cost measured against the Commission-approved cost of supply (p1).

Its bulk is a wholesale substitution of Regulation 9 (pp1–5), which converts FPPAS from a Commission-approved levy into an automatic, formula-driven monthly pass-through. The new Regulation 9 sets out the principle, the monthly billing cycle and the (n+2)th-month computation basis, a two-month cap on carry-forward to avoid tariff shock, carrying cost on carried-forward amounts, a graduated recovery rule where FPPAS crosses 5% of energy charge, annual true-up and the treatment of over- and under-recovery, reporting and website-publication duties, and a unified billing-system requirement for the licensee. Regulation 9.13 supplies the FPPAS formula with its variables, and 9.14–9.16 carve out deviation settlement, ancillary services/SCED and supplementary bills from the power purchase cost.

Finally, Regulation 47 is substituted (p5) so that an open access consumer inside a distribution licensee's supply area pays Cross-Subsidy Surcharge as determined by the Commission, subject to the statutory cap of twenty per cent of Average Cost of Supply.

Standard name
Tariff Regulations
Primary topics
Fuel and power purchase cost adjustment, Open access charges, Subsidy and cross-subsidy

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document